Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2012
Principal Product Plastic Jugs
NAICS 326160 - Plastics Bottle Manufacturing
SIC 3085 - Plastics Bottles
Sales $10,000,000-$50,000,000
# of Employees 30
Plant Area (Sq.Ft.) 14,000
Annual Production 5,500,000 Pieces
Production Hrs. Annual 7,900
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $200,191 4,742,880 kWh $0.04
Electricity Demand $65,297 9,645 kW-months/year $6.77
Electricity Fees $16,925 - $ -
TOTAL ENERGY COSTS $282,413
RECOMMENDED SAVINGS* $45,295 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,675
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 3.7121 IMPROVE HANDLING PRACTICES Savings:
$7,884
Cost:
$60
- - - - $7,884 - -
-
kWh
-
-
kW-months/year
$7,884
-
$
02: 2.2626 AVOID FROST FORMATION ON EVAPORATORS Savings:
$8,968
Cost:
-
$6,943 160,633 $2,025 282 - - $6,943
160,633
kWh
$2,025
282
kW-months/year
-
-
$
03: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$3,021
Cost:
$10,000
$3,021 69,909 - - - - $3,021
69,909
kWh
-
-
kW-months/year
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,053
Cost:
$8,053
$5,519 127,704 $1,534 214 - - $5,519
127,704
kWh
$1,534
214
kW-months/year
-
-
$
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$17,738
Cost:
$17,500
$15,127 350,011 $2,611 364 - - $15,127
350,011
kWh
$2,611
364
kW-months/year
-
-
$
06: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$631
Cost:
$4,131
$631 14,597 - - - - $631
14,597
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$45,295
Cost:
$39,744
$31,241 722,854 $6,170 860 $7,884 - $31,241
722,854
kWh
$6,170
860
kW-months/year
$7,884
-
$
TOTAL IMPLEMENTED Savings:
$32,675
Cost:
$25,613
$20,646 477,715 $4,145 578 $7,884 - $20,646
477,715
kWh
$4,145
578
kW-months/year
$7,884
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost