IAC logo
IAC Assessment: OR0607
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0607
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2013
Principal Product Lumber
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $5,000,000-$10,000,000
# of Employees 56
Plant Area (Sq.Ft.) 1,220,000
Annual Production 24,000,000 Units
Production Hrs. Annual 2,040
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $186,395 3,799,680 kWh $0.05
Electricity Demand $130,114 16,808 kW-months/year $7.74
Electricity Fees $26,732 - $ -
TOTAL ENERGY COSTS $343,241
RECOMMENDED SAVINGS* $71,768 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,004
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$52,535
Cost:
$27,268
$41,582 865,392 $10,953 1,378 - - $41,582
865,392
kWh
$10,953
1,378
kW-months/year
-
-
$
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$4,626
Cost:
$5,352
$4,626 96,286 - - - - $4,626
96,286
kWh
-
-
kW-months/year
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,603
Cost:
$9,150
- - - - $3,603 - -
-
kWh
-
-
kW-months/year
$3,603
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,983
Cost:
$7,504
$8,983 169,173 - - - - $8,983
169,173
kWh
-
-
kW-months/year
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,021
Cost:
$5,130
$2,021 42,059 - - - - $2,021
42,059
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$71,768
Cost:
$54,404
$57,212 1,172,910 $10,953 1,378 $3,603 - $57,212
1,172,910
kWh
$10,953
1,378
kW-months/year
$3,603
-
$
TOTAL IMPLEMENTED Savings:
$11,004
Cost:
$12,634
$11,004 211,232 - - - - $11,004
211,232
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees