Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2013 |
Principal Product | Sodium Hydrosulfite |
NAICS | 325180 - Other Basic Inorganic Chemical Manufacturing |
SIC | 2899 - Chemical Preparations, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 10 |
Plant Area (Sq.Ft.) | 9,300 |
Annual Production | 19,000,000 Pounds |
Production Hrs. Annual | 6,240 |
Location (State) | WA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $83,884 | 1,522,400 | kWh | $0.06 |
Electricity Demand | $34,056 | 4,979 | kW-months/year | $6.84 |
Electricity Fees | $1,350 | - | $ | - |
Natural Gas | $88,996 | 11,457 | MMBtu | $7.77 |
Other Gas | $67,300 | 9,021 | MMBtu | $7.46 |
TOTAL ENERGY COSTS | $279,186 | |||
RECOMMENDED SAVINGS* | $35,338 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $3,437 Cost: - |
$3,437 | 62,383 | - | - | - | - | - | - | - | - | - | - |
$3,437 62,383 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $8,684 Cost: $5,600 |
$8,589 | 155,874 | $95 | 14 | - | - | - | - | - | - | - | - |
$8,589 155,874 kWh |
$95 14 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $7,909 Cost: $37,830 |
- | - | - | - | $7,909 | 1,110 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$7,909 1,110 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4321 UPGRADE OBSOLETE EQUIPMENT |
Savings: $5,340 Cost: $11,938 |
$5,340 | 96,906 | - | - | - | - | - | - | - | - | - | - |
$5,340 96,906 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $2,436 Cost: $2,159 |
$1,793 | 32,522 | $71 | 10 | - | - | - | - | $316 | - | $256 | - |
$1,793 32,522 kWh |
$71 10 kW-months/year |
- - MMBtu |
- - lb |
$316 - $ |
$256 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $5,410 Cost: $3,724 |
- | - | - | - | $5,410 | 759 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,410 759 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5215 AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK |
Savings: $1,200 Cost: $5,464 |
- | - | - | - | - | - | $1,200 | 4 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,200 4 lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $922 Cost: $2,134 |
- | - | - | - | $922 | 129 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$922 129 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $35,338 Cost: $68,849 |
$19,159 | 347,685 | $166 | 24 | $14,241 | 1,998 | $1,200 | 4 | $316 | - | $256 | - | $19,159 347,685 kWh |
$166 24 kW-months/year |
$14,241 1,998 MMBtu |
$1,200 4 lb |
$316 - $ |
$256 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Administrative Changes | Ancillary Material Cost |