IAC logo
IAC Assessment: OR0611
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0611
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2013
Principal Product Sodium Hydrosulfite
NAICS 325180 - Other Basic Inorganic Chemical Manufacturing
SIC 2899 - Chemical Preparations, Nec
Sales $5,000,000-$10,000,000
# of Employees 10
Plant Area (Sq.Ft.) 9,300
Annual Production 19,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $83,884 1,522,400 kWh $0.06
Electricity Demand $34,056 4,979 kW-months/year $6.84
Electricity Fees $1,350 - $ -
Natural Gas $88,996 11,457 MMBtu $7.77
Other Gas $67,300 9,021 MMBtu $7.46
TOTAL ENERGY COSTS $279,186
RECOMMENDED SAVINGS* $35,338 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$3,437
Cost:
-
$3,437 62,383 - - - - - - - - - - $3,437
62,383
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$8,684
Cost:
$5,600
$8,589 155,874 $95 14 - - - - - - - - $8,589
155,874
kWh
$95
14
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$7,909
Cost:
$37,830
- - - - $7,909 1,110 - - - - - - -
-
kWh
-
-
kW-months/year
$7,909
1,110
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$5,340
Cost:
$11,938
$5,340 96,906 - - - - - - - - - - $5,340
96,906
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,436
Cost:
$2,159
$1,793 32,522 $71 10 - - - - $316 - $256 - $1,793
32,522
kWh
$71
10
kW-months/year
-
-
MMBtu
-
-
lb
$316
-
$
$256
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,410
Cost:
$3,724
- - - - $5,410 759 - - - - - - -
-
kWh
-
-
kW-months/year
$5,410
759
MMBtu
-
-
lb
-
-
$
-
-
$
07: 3.5215 AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK Savings:
$1,200
Cost:
$5,464
- - - - - - $1,200 4 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,200
4
lb
-
-
$
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$922
Cost:
$2,134
- - - - $922 129 - - - - - - -
-
kWh
-
-
kW-months/year
$922
129
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$35,338
Cost:
$68,849
$19,159 347,685 $166 24 $14,241 1,998 $1,200 4 $316 - $256 - $19,159
347,685
kWh
$166
24
kW-months/year
$14,241
1,998
MMBtu
$1,200
4
lb
$316
-
$
$256
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Administrative Changes Ancillary Material Cost