IAC logo
IAC Assessment: OR0612
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0612
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2013
Principal Product Green Stud Lumber
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 103
Plant Area (Sq.Ft.) 75,000
Annual Production 90,000 Thousand Feet
Production Hrs. Annual 4,200
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $698,998 12,453,900 kWh $0.06
Electricity Demand $216,818 31,402 kW-months/year $6.90
TOTAL ENERGY COSTS $915,816
RECOMMENDED SAVINGS* $56,436 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,614
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$30,841
Cost:
$79,939
$25,274 456,217 $5,567 795 - - - - $25,274
456,217
kWh
$5,567
795
kW-months/year
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$11,184
Cost:
$10,125
$8,600 155,241 $2,584 369 - - - - $8,600
155,241
kWh
$2,584
369
kW-months/year
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$7,387
Cost:
$13,420
$5,843 105,470 $1,002 143 $540 - $2 - $5,843
105,470
kWh
$1,002
143
kW-months/year
$540
-
$
$2
-
$
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$4,981
Cost:
$4,470
$3,262 58,872 $1,719 246 - - - - $3,262
58,872
kWh
$1,719
246
kW-months/year
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,043
Cost:
$922
$2,043 36,872 - - - - - - $2,043
36,872
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$56,436
Cost:
$108,876
$45,022 812,672 $10,872 1,553 $540 - $2 - $45,022
812,672
kWh
$10,872
1,553
kW-months/year
$540
-
$
$2
-
$
TOTAL IMPLEMENTED Savings:
$20,614
Cost:
$24,467
$16,486 297,583 $3,586 512 $540 - $2 - $16,486
297,583
kWh
$3,586
512
kW-months/year
$540
-
$
$2
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost