IAC logo
IAC Assessment: OR0614
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0614
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2013
Principal Product Seafood Products
NAICS 311710 - Seafood Product Preparation and Packaging
SIC 2092 - Fresh Or Frozen Prepared Fish
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 95,000
Annual Production 12,492,000 Pounds
Production Hrs. Annual 4,680
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $371,937 6,045,600 kWh $0.06
Electricity Demand $99,339 13,757 kW-months/year $7.22
Natural Gas $151,317 22,287 MMBtu $6.79
TOTAL ENERGY COSTS $622,593
RECOMMENDED SAVINGS* $54,286 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,428
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$31,637
Cost:
$42,000
$26,341 428,171 $5,296 736 - - - - $26,341
428,171
kWh
$5,296
736
kW-months/year
-
-
MMBtu
-
-
$
02: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$16,101
Cost:
$10,000
$16,101 261,727 - - - - - - $16,101
261,727
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,327
Cost:
-
- - - - $5,327 882 $(-1,000) - -
-
kWh
-
-
kW-months/year
$5,327
882
MMBtu
$(-1,000)
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,554
Cost:
$1,828
- - - - $1,554 257 - - -
-
kWh
-
-
kW-months/year
$1,554
257
MMBtu
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$667
Cost:
$446
- - - - $667 110 - - -
-
kWh
-
-
kW-months/year
$667
110
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$54,286
Cost:
$54,274
$42,442 689,898 $5,296 736 $7,548 1,249 $(-1,000) - $42,442
689,898
kWh
$5,296
736
kW-months/year
$7,548
1,249
MMBtu
$(-1,000)
-
$
TOTAL IMPLEMENTED Savings:
$20,428
Cost:
$10,000
$16,101 261,727 - - $5,327 882 $(-1,000) - $16,101
261,727
kWh
-
-
kW-months/year
$5,327
882
MMBtu
$(-1,000)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes