IAC logo
IAC Assessment: OR0623
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0623
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2013
Principal Product Softwood Veneer
NAICS 321212 - Softwood Veneer and Plywood Manufacturing
SIC 2436 - Softwood Veneer And Plywood
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 400,000
Annual Production 352,679 Units
Production Hrs. Annual 6,800
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $133,028 1,532,581 kWh $0.09
Electricity Demand $58,968 7,569 kW-months/year $7.79
Electricity Fees $9,475 - $ -
LPG $289,925 14,262 MMBtu $20.33
TOTAL ENERGY COSTS $491,396
RECOMMENDED SAVINGS* $37,492 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,693
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 4.454 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$7,500
Cost:
$700
$7,500 140,377 $7,500
140,377
kWh
02: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$3,199
Cost:
$1,260
$3,199 59,882 $3,199
59,882
kWh
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$6,693
Cost:
$1,500
$6,693 125,256 $6,693
125,256
kWh
04: 4.454 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$2,617
Cost:
$2,500
$2,617 48,980 $2,617
48,980
kWh
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$8,023
Cost:
$9,452
$8,023 150,159 $8,023
150,159
kWh
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,460
Cost:
$11,957
$9,460 177,148 $9,460
177,148
kWh
TOTAL RECOMMENDED Savings:
$37,492
Cost:
$27,369
$37,492 701,802 $37,492
701,802
kWh
TOTAL IMPLEMENTED Savings:
$6,693
Cost:
$1,500
$6,693 125,256 $6,693
125,256
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage