IAC logo
IAC Assessment: OR0625
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0625
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2014
Principal Product Machined Parts
NAICS 332710 - Machine Shops
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 45,000
Annual Production 300,000 Pieces
Production Hrs. Annual 4,160
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $116,801 1,593,853 kWh $0.07
Electricity Demand $21,696 4,114 kW-months/year $5.27
Electricity Fees $8,561 - $ -
TOTAL ENERGY COSTS $147,058
RECOMMENDED SAVINGS* $34,753 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$11,654
Cost:
$1,000
$11,654 140,394 - - $11,654
140,394
kWh
-
-
kW-months/year
02: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$5,751
Cost:
$5,908
$5,751 64,326 - - $5,751
64,326
kWh
-
-
kW-months/year
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,834
Cost:
$800
$3,834 42,883 - - $3,834
42,883
kWh
-
-
kW-months/year
04: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$5,889
Cost:
$72,131
$5,768 69,485 $121 23 $5,768
69,485
kWh
$121
23
kW-months/year
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,528
Cost:
-
$4,956 55,422 $572 119 $4,956
55,422
kWh
$572
119
kW-months/year
06: 2.5123 REDUCE FLUID FLOW RATES Savings:
$2,097
Cost:
$5,600
$2,097 23,998 - - $2,097
23,998
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$34,753
Cost:
$85,439
$34,060 396,508 $693 142 $34,060
396,508
kWh
$693
142
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand