IAC logo
IAC Assessment: OR0629
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0629
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2014
Principal Product Malted Barley
NAICS 311213 - Malt Manufacturing
SIC 2083 - Malt
Sales $50,000,000-$100,000,000
# of Employees 105
Plant Area (Sq.Ft.) 75,000
Annual Production 132,000 Tons
Production Hrs. Annual 7,488
Location (State) WA
View Case Study
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $949,062 20,238,230 kWh $0.05
Electricity Demand $240,683 40,519 kW-months/year $5.94
Electricity Fees $36,001 - $ -
Natural Gas $2,056,903 380,908 MMBtu $5.40
TOTAL ENERGY COSTS $3,282,649
RECOMMENDED SAVINGS* $657,757 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $619,894
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.5121 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH Savings:
$37,907
Cost:
$21,000
$32,256 694,434 $5,651 951 - - - - $32,256
694,434
kWh
$5,651
951
kW-months/year
-
-
MMBtu
-
-
$
02: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$37,863
Cost:
$38,930
- - - - $37,863 7,012 - - -
-
kWh
-
-
kW-months/year
$37,863
7,012
MMBtu
-
-
$
03: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$58,681
Cost:
$3,764
$49,934 1,075,012 $8,747 1,473 - - - - $49,934
1,075,012
kWh
$8,747
1,473
kW-months/year
-
-
MMBtu
-
-
$
04: 2.1224 REPLACE BOILER Savings:
$523,306
Cost:
$3,403,664
- - - - $233,306 43,205 $290,000 - -
-
kWh
-
-
kW-months/year
$233,306
43,205
MMBtu
$290,000
-
$
TOTAL RECOMMENDED Savings:
$657,757
Cost:
$3,467,358
$82,190 1,769,446 $14,398 2,424 $271,169 50,217 $290,000 - $82,190
1,769,446
kWh
$14,398
2,424
kW-months/year
$271,169
50,217
MMBtu
$290,000
-
$
TOTAL IMPLEMENTED Savings:
$619,894
Cost:
$3,428,428
$82,190 1,769,446 $14,398 2,424 $233,306 43,205 $290,000 - $82,190
1,769,446
kWh
$14,398
2,424
kW-months/year
$233,306
43,205
MMBtu
$290,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes