IAC logo
IAC Assessment: OR0633
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0633
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2014
Principal Product Plywood Panels
NAICS 321212 - Softwood Veneer and Plywood Manufacturing
SIC 2436 - Softwood Veneer And Plywood
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 900,000
Annual Production 2,000,000 Pounds
Production Hrs. Annual 6,864
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $570,810 14,478,640 kWh $0.04
Electricity Demand $240,492 35,978 kW-months/year $6.68
Natural Gas $195,809 36,304 MMBtu $5.39
TOTAL ENERGY COSTS $1,007,111
RECOMMENDED SAVINGS* $510,314 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Product Electricity Usage Electricity Demand Natural Gas Primary Product
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$107,219
Cost:
$4,630
$87,003 2,301,659 $20,216 3,522 - - - - $87,003
2,301,659
kWh
$20,216
3,522
kW-months/year
-
-
MMBtu
-
-
$
02: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$392,710
Cost:
$105,114
- - - - - - $392,710 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$392,710
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,456
Cost:
$1,771
- - - - $2,456 486 - - -
-
kWh
-
-
kW-months/year
$2,456
486
MMBtu
-
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$7,929
Cost:
$4,920
$7,929 209,751 - - - - - - $7,929
209,751
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$510,314
Cost:
$116,435
$94,932 2,511,410 $20,216 3,522 $2,456 486 $392,710 - $94,932
2,511,410
kWh
$20,216
3,522
kW-months/year
$2,456
486
MMBtu
$392,710
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Primary Product Electricity Usage Electricity Demand Natural Gas Primary Product