IAC logo
IAC Assessment: OR0648
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0648
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2015
Principal Product Treated Water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $5,000,000-$10,000,000
# of Employees 10
Plant Area (Sq.Ft.) 830,000
Annual Production 71,000,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $223,929 4,227,000 kWh $0.05
Electricity Demand $105,172 11,352 kW-months/year $9.26
Electricity Fees $17,833 - $ -
Natural Gas $10,192 701 MMBtu $14.54
TOTAL ENERGY COSTS $357,126
RECOMMENDED SAVINGS* $48,816 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,899
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$16,127
Cost:
$9,607
$13,478 244,390 $2,649 336 - - - - $13,478
244,390
kWh
$2,649
336
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$25,082
Cost:
$17,274
$25,082 454,800 - - - - - - $25,082
454,800
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$2,772
Cost:
$50
- - - - $2,772 - - - -
-
kWh
-
-
kW-months/year
$2,772
-
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,835
Cost:
$9,332
$7,375 133,726 - - - - $(-2,540) - $7,375
133,726
kWh
-
-
kW-months/year
-
-
MMBtu
$(-2,540)
-
$
TOTAL RECOMMENDED Savings:
$48,816
Cost:
$36,263
$45,935 832,916 $2,649 336 $2,772 - $(-2,540) - $45,935
832,916
kWh
$2,649
336
kW-months/year
$2,772
-
MMBtu
$(-2,540)
-
$
TOTAL IMPLEMENTED Savings:
$18,899
Cost:
$9,657
$13,478 244,390 $2,649 336 $2,772 - - - $13,478
244,390
kWh
$2,649
336
kW-months/year
$2,772
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes