IAC Assessment: OR0652
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0652
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2015
Principal Product Fruit and Candy
NAICS 311340 - Nonchocolate Confectionery Manufacturing
SIC 2064 - Candy & Other Confectionery Products
Sales $100,000,000-$500,000,000
# of Employees 1,000
Plant Area (Sq.Ft.) 1,074,000
Annual Production 5,000,000 Pieces
Production Hrs. Annual 5,000
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,035,482 21,929,400 kWh $0.05
Electricity Demand $383,502 80,257 kW-months/year $4.78
Natural Gas $181,458 49,017 MMBtu $3.70
TOTAL ENERGY COSTS $1,600,442
RECOMMENDED SAVINGS* $23,390 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
01: 2.1392 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE Savings:
$7,000
Cost:
$54,000
- - - - $7,000 2,100 - - - - - - -
-
kWh
-
-
kW-months/year
$7,000
2,100
MMBtu
-
-
gal
-
-
$
-
-
$
02: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$2,010
Cost:
$2,900
- - - - - - $610 410,000 $1,600 - $(-200) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$610
410,000
gal
$1,600
-
$
$(-200)
-
$
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$2,990
Cost:
-
$2,400 49,000 $590 67 - - - - - - - - $2,400
49,000
kWh
$590
67
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
04: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$6,390
Cost:
$51,745
$6,000 120,000 $390 44 - - - - - - - - $6,000
120,000
kWh
$390
44
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
05: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$5,000
Cost:
$15,000
$5,000 100,000 - - - - - - - - - - $5,000
100,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$23,390
Cost:
$123,645
$13,400 269,000 $980 111 $7,000 2,100 $610 410,000 $1,600 - $(-200) - $13,400
269,000
kWh
$980
111
kW-months/year
$7,000
2,100
MMBtu
$610
410,000
gal
$1,600
-
$
$(-200)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost