Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2016
Principal Product pharmaceuticals
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $50,000,000-$100,000,000
# of Employees 325
Plant Area (Sq.Ft.) 348,480
Annual Production 6,614 Units
Production Hrs. Annual 8,568
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $336,082 5,491,305 kWh $0.06
Electricity Demand $110,882 13,434 kW-months/year $8.25
Electricity Fees $48,021 - $ -
Natural Gas $84,970 12,822 MMBtu $6.63
TOTAL ENERGY COSTS $882,355
RECOMMENDED SAVINGS* $458,356 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$9,894
Cost:
$5,100
$1,017 15,938 - - $8,877 1,339 - - - - - - $1,017
15,938
kWh
-
-
kW-months/year
$8,877
1,339
MMBtu
-
-
gal
-
-
$
-
-
$
02: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$375,721
Cost:
$189,945
- - - - $73,321 11,061 $302,400 134,400 - - - - -
-
kWh
-
-
kW-months/year
$73,321
11,061
MMBtu
$302,400
134,400
gal
-
-
$
-
-
$
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$39,019
Cost:
$15,722
$29,956 469,604 - - $9,063 1,367 - - - - - - $29,956
469,604
kWh
-
-
kW-months/year
$9,063
1,367
MMBtu
-
-
gal
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,352
Cost:
$500
$1,208 18,933 $144 39 - - - - - - - - $1,208
18,933
kWh
$144
39
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,233
Cost:
$5,720
$3,181 49,866 - - - - - - $420 - $632 - $3,181
49,866
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$420
-
$
$632
-
$
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$28,137
Cost:
$340,762
$28,014 439,167 $123 33 - - - - - - - - $28,014
439,167
kWh
$123
33
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$458,356
Cost:
$557,749
$63,376 993,508 $267 72 $91,261 13,767 $302,400 134,400 $420 - $632 - $63,376
993,508
kWh
$267
72
kW-months/year
$91,261
13,767
MMBtu
$302,400
134,400
gal
$420
-
$
$632
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Administrative Changes Ancillary Material Cost