IAC Assessment: OR0670
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0670
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2016
Principal Product Pharmaceutical Drugs
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $5,000,000-$10,000,000
# of Employees 55
Plant Area (Sq.Ft.) 22,000
Annual Production 22,046 Pounds
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $39,741 511,949 kWh $0.08
Electricity Demand $10,869 1,534 kW-months/year $7.09
Electricity Fees $33 - $ -
Natural Gas $59,873 7,454 MMBtu $8.03
TOTAL ENERGY COSTS $110,516
RECOMMENDED SAVINGS* $318,900 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,415
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Gas Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Natural Gas Other Gas Personnel Changes Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $ $ %
01: 2.5123 REDUCE FLUID FLOW RATES Savings:
$244,946
Cost:
$880,000
$73 889 $(-5,127) (-379) - - - - - - - - $250,000 - $73
889
kWh
$(-5,127)
(-379)
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
$250,000
-
%
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$13,371
Cost:
$5,100
$3,777 53,410 - - $9,594 1,173 - - - - - - - - $3,777
53,410
kWh
-
-
kW-months/year
$9,594
1,173
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
%
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$14,066
Cost:
$10,367
$10,866 120,610 $865 161 - - - - $906 - $1,429 - - - $10,866
120,610
kWh
$865
161
kW-months/year
-
-
MMBtu
-
-
MMBtu
$906
-
$
$1,429
-
$
-
-
%
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$8,978
Cost:
$1,314
$3,390 41,060 - - $5,588 683 - - - - - - - - $3,390
41,060
kWh
-
-
kW-months/year
$5,588
683
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
%
05: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$8,398
Cost:
$2,405
- - - - - - $8,398 2,320 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$8,398
2,320
MMBtu
-
-
$
-
-
$
-
-
%
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$29,141
Cost:
$269,109
$28,988 351,126 $153 26 - - - - - - - - - - $28,988
351,126
kWh
$153
26
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$318,900
Cost:
$1,168,295
$47,094 567,095 $(-4,109) (-192) $15,182 1,856 $8,398 2,320 $906 - $1,429 - $250,000 - $47,094
567,095
kWh
$(-4,109)
(-192)
kW-months/year
$15,182
1,856
MMBtu
$8,398
2,320
MMBtu
$906
-
$
$1,429
-
$
$250,000
-
%
TOTAL IMPLEMENTED Savings:
$36,415
Cost:
$16,781
$18,033 215,080 $865 161 $15,182 1,856 - - $906 - $1,429 - - - $18,033
215,080
kWh
$865
161
kW-months/year
$15,182
1,856
MMBtu
-
-
MMBtu
$906
-
$
$1,429
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $ $ %
Electricity Usage Electricity Demand Natural Gas Other Gas Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Natural Gas Other Gas Personnel Changes Ancillary Material Cost Increase in Production