Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2016 |
Principal Product | Pharmaceutical Drugs |
NAICS | 325412 - Pharmaceutical Preparation Manufacturing |
SIC | 2834 - Pharmaceutical Preparations |
Sales | $5,000,000-$10,000,000 |
# of Employees | 55 |
Plant Area (Sq.Ft.) | 22,000 |
Annual Production | 22,046 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $39,741 | 511,949 | kWh | $0.08 |
Electricity Demand | $10,869 | 1,534 | kW-months/year | $7.09 |
Electricity Fees | $33 | - | $ | - |
Natural Gas | $59,873 | 7,454 | MMBtu | $8.03 |
TOTAL ENERGY COSTS | $110,516 | |||
RECOMMENDED SAVINGS* | $318,900 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $36,415 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Gas | Personnel Changes | Ancillary Material Cost | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Other Gas | Personnel Changes | Ancillary Material Cost | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.5123 REDUCE FLUID FLOW RATES |
Savings: $244,946 Cost: $880,000 |
$73 | 889 | $(-5,127) | (-379) | - | - | - | - | - | - | - | - | $250,000 | - |
$73 889 kWh |
$(-5,127) (-379) kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
$250,000 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $13,371 Cost: $5,100 |
$3,777 | 53,410 | - | - | $9,594 | 1,173 | - | - | - | - | - | - | - | - |
$3,777 53,410 kWh |
- - kW-months/year |
$9,594 1,173 MMBtu |
- - MMBtu |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $14,066 Cost: $10,367 |
$10,866 | 120,610 | $865 | 161 | - | - | - | - | $906 | - | $1,429 | - | - | - |
$10,866 120,610 kWh |
$865 161 kW-months/year |
- - MMBtu |
- - MMBtu |
$906 - $ |
$1,429 - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $8,978 Cost: $1,314 |
$3,390 | 41,060 | - | - | $5,588 | 683 | - | - | - | - | - | - | - | - |
$3,390 41,060 kWh |
- - kW-months/year |
$5,588 683 MMBtu |
- - MMBtu |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT |
Savings: $8,398 Cost: $2,405 |
- | - | - | - | - | - | $8,398 | 2,320 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$8,398 2,320 MMBtu |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $29,141 Cost: $269,109 |
$28,988 | 351,126 | $153 | 26 | - | - | - | - | - | - | - | - | - | - |
$28,988 351,126 kWh |
$153 26 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $318,900 Cost: $1,168,295 |
$47,094 | 567,095 | $(-4,109) | (-192) | $15,182 | 1,856 | $8,398 | 2,320 | $906 | - | $1,429 | - | $250,000 | - | $47,094 567,095 kWh |
$(-4,109) (-192) kW-months/year |
$15,182 1,856 MMBtu |
$8,398 2,320 MMBtu |
$906 - $ |
$1,429 - $ |
$250,000 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $36,415 Cost: $16,781 |
$18,033 | 215,080 | $865 | 161 | $15,182 | 1,856 | - | - | $906 | - | $1,429 | - | - | - | $18,033 215,080 kWh |
$865 161 kW-months/year |
$15,182 1,856 MMBtu |
- - MMBtu |
$906 - $ |
$1,429 - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Gas | Personnel Changes | Ancillary Material Cost | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Other Gas | Personnel Changes | Ancillary Material Cost | Increase in Production |