Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2016 |
Principal Product | Treated Wood |
NAICS | 321114 - Wood Preservation |
SIC | 2491 - Wood Preserving |
Sales | $10,000,000-$50,000,000 |
# of Employees | 33 |
Plant Area (Sq.Ft.) | 1,393,920 |
Annual Production | 1,700,000 Units |
Production Hrs. Annual | 6,240 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $160,142 | 2,486,675 | kWh | $0.06 |
Electricity Demand | $127,761 | 8,345 | kW-months/year | $15.31 |
Electricity Fees | $11,773 | - | $ | - |
Natural Gas | $308,454 | 64,965 | MMBtu | $4.75 |
Other Gas | $42,971 | 1,922 | MMBtu | $22.36 |
TOTAL ENERGY COSTS | $651,101 | |||
RECOMMENDED SAVINGS* | $255,092 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $232,621 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Personnel Changes | Ancillary Material Cost | Water Consumption | Electricity Usage | Natural Gas | Personnel Changes | Ancillary Material Cost | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,742 Cost: - |
$4,742 | 73,630 | - | - | - | - | - | - | - | - |
$4,742 73,630 kWh |
- - MMBtu |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $17,729 Cost: $6,828 |
- | - | $17,729 | 3,732 | - | - | - | - | - | - |
- - kWh |
$17,729 3,732 MMBtu |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.1244 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS |
Savings: $216,607 Cost: $80,000 |
- | - | - | - | - | - | $216,607 | - | - | - |
- - kWh |
- - MMBtu |
- - $ |
$216,607 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $11,774 Cost: $7,200 |
$(-874) | (-13,572) | - | - | - | - | - | - | $12,648 | - |
$(-874) (-13,572) kWh |
- - MMBtu |
- - $ |
- - $ |
$12,648 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7131 ADD AREA LIGHTING SWITCHES |
Savings: $1,356 Cost: $1,062 |
$1,069 | 16,595 | - | - | $95 | - | $192 | - | - | - |
$1,069 16,595 kWh |
- - MMBtu |
$95 - $ |
$192 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $2,884 Cost: $6,584 |
- | - | $2,884 | 607 | - | - | - | - | - | - |
- - kWh |
$2,884 607 MMBtu |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $255,092 Cost: $101,674 |
$4,937 | 76,653 | $20,613 | 4,339 | $95 | - | $216,799 | - | $12,648 | - | $4,937 76,653 kWh |
$20,613 4,339 MMBtu |
$95 - $ |
$216,799 - $ |
$12,648 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $232,621 Cost: $94,846 |
$195 | 3,023 | $2,884 | 607 | $95 | - | $216,799 | - | $12,648 | - | $195 3,023 kWh |
$2,884 607 MMBtu |
$95 - $ |
$216,799 - $ |
$12,648 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Personnel Changes | Ancillary Material Cost | Water Consumption | Electricity Usage | Natural Gas | Personnel Changes | Ancillary Material Cost | Water Consumption |