IAC Assessment: OR0686
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0686
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2017
Principal Product Vinyl Components
NAICS 321911 - Wood Window and Door Manufacturing
SIC 2431 - Millwork
Sales $50,000,000-$100,000,000
# of Employees 150
Plant Area (Sq.Ft.) 140,000
Annual Production 48,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $588,584 14,288,800 kWh $0.04
Electricity Demand $296,475 39,530 kW-months/year $7.50
Electricity Fees $89,263 - $ -
Natural Gas $42,199 4,758 MMBtu $8.87
TOTAL ENERGY COSTS $1,031,154
RECOMMENDED SAVINGS* $226,176 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes Administrative Changes Increase in Production Electricity Usage Electricity Demand Water Disposal Personnel Changes Administrative Changes Increase in Production
$ kWh $ kW-months/year $ Tgal $ $ $ $ $ %
01: 4.625 DEVELOP STANDARD OPERATING PROCEDURES Savings:
$181,947
Cost:
$31,400
- - - - $(-14,633) (-24,000) $28,080 - $(-7,000) - $175,500 - -
-
kWh
-
-
kW-months/year
$(-14,633)
(-24,000)
Tgal
$28,080
-
$
$(-7,000)
-
$
$175,500
-
%
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$5,219
Cost:
-
$5,219 115,318 - - - - - - - - - - $5,219
115,318
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
%
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$15,997
Cost:
$1,200
$15,997 353,464 - - - - - - - - - - $15,997
353,464
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
%
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,155
Cost:
-
$1,596 35,259 $559 68 - - - - - - - - $1,596
35,259
kWh
$559
68
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
%
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$15,115
Cost:
$16,115
$12,193 269,576 $2,922 355 - - - - - - - - $12,193
269,576
kWh
$2,922
355
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
%
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,743
Cost:
$500
$5,619 124,149 $124 15 - - - - - - - - $5,619
124,149
kWh
$124
15
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$226,176
Cost:
$49,215
$40,624 897,766 $3,605 438 $(-14,633) (-24,000) $28,080 - $(-7,000) - $175,500 - $40,624
897,766
kWh
$3,605
438
kW-months/year
$(-14,633)
(-24,000)
Tgal
$28,080
-
$
$(-7,000)
-
$
$175,500
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $ $ %
Electricity Usage Electricity Demand Water Disposal Personnel Changes Administrative Changes Increase in Production Electricity Usage Electricity Demand Water Disposal Personnel Changes Administrative Changes Increase in Production