IAC logo
IAC Assessment: OR0689
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0689
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2017
Principal Product Custom metal fabrication
NAICS 332710 - Machine Shops
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 175,000
Annual Production 10 Units
Production Hrs. Annual 6,240
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $130,419 1,863,140 kWh $0.07
Electricity Demand $78,080 7,871 kW-months/year $9.92
Natural Gas $37,779 7,090 MMBtu $5.33
TOTAL ENERGY COSTS $606,278
RECOMMENDED SAVINGS* $38,596 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,104
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz)
$ kWh $ kW-months/year $ MMBtu $ gal
01: 4.132 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST Savings:
$12,509
Cost:
$19,000
$12,509 177,912 - - - - - - $12,509
177,912
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
02: 3.8113 PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) Savings:
$18,000
Cost:
$1,495
- - - - - - $18,000 150 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$18,000
150
gal
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,595
Cost:
$5,595
$4,435 63,080 $160 16 - - - - $4,435
63,080
kWh
$160
16
kW-months/year
-
-
MMBtu
-
-
gal
04: 2.7314 REDUCE VENTILATION AIR Savings:
$3,492
Cost:
$12,558
- - - - $3,492 872 - - -
-
kWh
-
-
kW-months/year
$3,492
872
MMBtu
-
-
gal
TOTAL RECOMMENDED Savings:
$38,596
Cost:
$38,648
$16,944 240,992 $160 16 $3,492 872 $18,000 150 $16,944
240,992
kWh
$160
16
kW-months/year
$3,492
872
MMBtu
$18,000
150
gal
TOTAL IMPLEMENTED Savings:
$35,104
Cost:
$26,090
$16,944 240,992 $160 16 - - $18,000 150 $16,944
240,992
kWh
$160
16
kW-months/year
-
-
MMBtu
$18,000
150
gal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz)