IAC logo
IAC Assessment: OR0693
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0693
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2017
Principal Product Fabricated Metal Structures
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3441 - Fabricated Structural Metal
Sales $100,000,000-$500,000,000
# of Employees 100
Plant Area (Sq.Ft.) 500,940
Annual Production 15 Units
Production Hrs. Annual 6,240
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $228,556 4,686,400 kWh $0.05
Electricity Demand $120,715 16,814 kW-months/year $7.18
TOTAL ENERGY COSTS $349,270
RECOMMENDED SAVINGS* $82,899 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,809
Cost:
$500
$1,916 41,274 $2,893 403 - - $1,916
41,274
kWh
$2,893
403
kW-months/year
-
-
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,614
Cost:
$2,800
$5,614 111,224 - - - - $5,614
111,224
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$27,216
Cost:
$28,216
$19,808 426,894 $7,408 1,032 - - $19,808
426,894
kWh
$7,408
1,032
kW-months/year
-
-
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$45,260
Cost:
$144,180
$76,521 1,649,165 - - $(-31,261) (-6,252) $76,521
1,649,165
kWh
-
-
kW-months/year
$(-31,261)
(-6,252)
MMBtu
TOTAL RECOMMENDED Savings:
$82,899
Cost:
$175,696
$103,859 2,228,557 $10,301 1,435 $(-31,261) (-6,252) $103,859
2,228,557
kWh
$10,301
1,435
kW-months/year
$(-31,261)
(-6,252)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas