IAC logo
IAC Assessment: OR0694
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0694
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2017
Principal Product Juice and Puree
NAICS 311411 - Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037 - Frozen Fruits And Vegetables
Sales $50,000,000-$100,000,000
# of Employees 110
Plant Area (Sq.Ft.) 44,227
Annual Production 136 Units
Production Hrs. Annual 7,296
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $184,623 2,298,203 kWh $0.08
Electricity Demand $17,509 3,070 kW-months/year $5.70
Natural Gas $242,268 70,640 MMBtu $3.43
TOTAL ENERGY COSTS $716,639
RECOMMENDED SAVINGS* $535,529 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Personnel Changes Primary Product Increase in Production Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Personnel Changes Primary Product Increase in Production
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ $ $ $ $ %
01: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$190,250
Cost:
$7,842
- - - - $(-2,950) (-844) - - - - - - $193,200 - - - -
-
kWh
-
-
kW-months/year
$(-2,950)
(-844)
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
$193,200
-
$
-
-
%
02: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$78,503
Cost:
$7,018
- - - - - - - - - - - - - - $78,503 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
$78,503
-
%
03: 4.651 INSTALL BACK-UP EQUIPMENT Savings:
$219,130
Cost:
$45,000
- - - - - - - - - - $219,130 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
$219,130
-
$
-
-
$
-
-
%
04: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$29,962
Cost:
$12,100
- - - - - - - - - - $29,962 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
$29,962
-
$
-
-
$
-
-
%
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,605
Cost:
$10,606
$9,043 130,760 $562 111 - - - - - - - - - - - - $9,043
130,760
kWh
$562
111
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
-
-
%
06: 3.4151 MINIMIZE WATER USAGE Savings:
$8,079
Cost:
$15,125
- - - - - - $3,403 1,562 $4,676 1,562 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,403
1,562
Tgal
$4,676
1,562
Tgal
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$535,529
Cost:
$97,691
$9,043 130,760 $562 111 $(-2,950) (-844) $3,403 1,562 $4,676 1,562 $249,092 - $193,200 - $78,503 - $9,043
130,760
kWh
$562
111
kW-months/year
$(-2,950)
(-844)
MMBtu
$3,403
1,562
Tgal
$4,676
1,562
Tgal
$249,092
-
$
$193,200
-
$
$78,503
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ $ $ $ $ %
Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Personnel Changes Primary Product Increase in Production Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Personnel Changes Primary Product Increase in Production