IAC Assessment: OR0711
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0711
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2018
Principal Product Treated Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $50,000,000-$100,000,000
# of Employees 235
Plant Area (Sq.Ft.) 1,203,520
Annual Production 6,935,000 Units
Production Hrs. Annual 8,760
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $781,420 17,442,403 kWh $0.04
Electricity Demand $199,512 23,894 kW-months/year $8.35
Electricity Fees $242,219 - $ -
TOTAL ENERGY COSTS $1,223,151
RECOMMENDED SAVINGS* $1,162,732 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS Savings:
$1,082,323
Cost:
$800,001
$(-104,185) (-1,774,868) $(-14,127) (-1,692) $1,200,635 38,101 $(-104,185)
(-1,774,868)
kWh
$(-14,127)
(-1,692)
kW-months/year
$1,200,635
38,101
MMBtu
02: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$68,286
Cost:
$68,224
- - - - $68,286 13,657 -
-
kWh
-
-
kW-months/year
$68,286
13,657
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,749
Cost:
$10,303
$2,301 39,195 $448 54 - - $2,301
39,195
kWh
$448
54
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,277
Cost:
$1,904
$1,069 18,212 $208 25 - - $1,069
18,212
kWh
$208
25
kW-months/year
-
-
MMBtu
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$8,097
Cost:
$30,240
$6,054 103,142 $2,043 245 - - $6,054
103,142
kWh
$2,043
245
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$1,162,732
Cost:
$910,672
$(-94,761) (-1,614,319) $(-11,428) (-1,368) $1,268,921 51,758 $(-94,761)
(-1,614,319)
kWh
$(-11,428)
(-1,368)
kW-months/year
$1,268,921
51,758
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas