IAC logo
IAC Assessment: OR0715
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0715
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2019
Principal Product Industrial Asphalt, Paving Asphalt
NAICS 324121 - Asphalt Paving Mixture and Block Manufacturing
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $10,000,000-$50,000,000
# of Employees 20
Plant Area (Sq.Ft.) 522,720
Annual Production 130,000 Tons
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $222,744 3,411,418 kWh $0.07
Electricity Demand $3 1 kW-months/year $2.61
Electricity Fees $2,980 - $ -
Natural Gas $573,986 160,668 MMBtu $3.57
TOTAL ENERGY COSTS $799,713
RECOMMENDED SAVINGS* $18,891 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,152
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$4,573
Cost:
$5,513
- - - - $4,573 1,281 -
-
kWh
-
-
kW-months/year
$4,573
1,281
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$10,166
Cost:
$71,155
- - - - $10,166 2,848 -
-
kWh
-
-
kW-months/year
$10,166
2,848
MMBtu
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,204
Cost:
-
$2,827 42,646 $377 145 - - $2,827
42,646
kWh
$377
145
kW-months/year
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$948
Cost:
-
$927 13,989 $21 8 - - $927
13,989
kWh
$21
8
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$18,891
Cost:
$76,668
$3,754 56,635 $398 153 $14,739 4,129 $3,754
56,635
kWh
$398
153
kW-months/year
$14,739
4,129
MMBtu
TOTAL IMPLEMENTED Savings:
$4,152
Cost:
-
$3,754 56,635 $398 153 - - $3,754
56,635
kWh
$398
153
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas