Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2019 |
Principal Product | Beer |
NAICS | 312120 - Breweries |
SIC | 2082 - Malt Beverages |
Sales | $100,000,000-$500,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 300,000 Units |
Production Hrs. Annual | 7,200 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $278,475 | 5,254,239 | kWh | $0.05 |
Electricity Demand | $4 | 1 | kW-months/year | $3.85 |
Natural Gas | $202,161 | 47,388 | MMBtu | $4.27 |
TOTAL ENERGY COSTS | $494,622 | |||
RECOMMENDED SAVINGS* | $243,036 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,163 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Water Disposal | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Water Disposal | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2694 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE |
Savings: $1,163 Cost: - |
$1,065 | 20,101 | $98 | 26 | - | - | - | - | - | - | - | - |
$1,065 20,101 kWh |
$98 26 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.4151 MINIMIZE WATER USAGE |
Savings: $20,973 Cost: $587 |
- | - | - | - | - | - | $6,991 | 2,696 | $13,982 | 2,696 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$6,991 2,696 Tgal |
$13,982 2,696 Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $14,061 Cost: $7,650 |
$14,061 | 203,831 | - | - | - | - | - | - | - | - | - | - |
$14,061 203,831 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $2,624 Cost: $3,273 |
$571 | 10,769 | - | - | $2,053 | 496 | - | - | - | - | - | - |
$571 10,769 kWh |
- - kW-months/year |
$2,053 496 MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $204,215 Cost: $143,400 |
$(-32,035) | (-604,440) | - | - | - | - | - | - | - | - | $236,250 | - |
$(-32,035) (-604,440) kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
$236,250 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $243,036 Cost: $154,910 |
$(-16,338) | (-369,739) | $98 | 26 | $2,053 | 496 | $6,991 | 2,696 | $13,982 | 2,696 | $236,250 | - | $(-16,338) (-369,739) kWh |
$98 26 kW-months/year |
$2,053 496 MMBtu |
$6,991 2,696 Tgal |
$13,982 2,696 Tgal |
$236,250 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,163 Cost: - |
$1,065 | 20,101 | $98 | 26 | - | - | - | - | - | - | - | - | $1,065 20,101 kWh |
$98 26 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Water Disposal | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Water Disposal | Primary Raw Material |