IAC Assessment: OR0717
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0717
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2019
Principal Product Beer
NAICS 312120 - Breweries
SIC 2082 - Malt Beverages
Sales $100,000,000-$500,000,000
# of Employees 200
Plant Area (Sq.Ft.) 60,000
Annual Production 300,000 Units
Production Hrs. Annual 7,200
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $278,475 5,254,239 kWh $0.05
Electricity Demand $4 1 kW-months/year $3.85
Natural Gas $202,161 47,388 MMBtu $4.27
TOTAL ENERGY COSTS $494,622
RECOMMENDED SAVINGS* $243,036 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,163
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Primary Raw Material Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ $
01: 2.2694 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE Savings:
$1,163
Cost:
-
$1,065 20,101 $98 26 - - - - - - - - $1,065
20,101
kWh
$98
26
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
02: 3.4151 MINIMIZE WATER USAGE Savings:
$20,973
Cost:
$587
- - - - - - $6,991 2,696 $13,982 2,696 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,991
2,696
Tgal
$13,982
2,696
Tgal
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$14,061
Cost:
$7,650
$14,061 203,831 - - - - - - - - - - $14,061
203,831
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$2,624
Cost:
$3,273
$571 10,769 - - $2,053 496 - - - - - - $571
10,769
kWh
-
-
kW-months/year
$2,053
496
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
05: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$204,215
Cost:
$143,400
$(-32,035) (-604,440) - - - - - - - - $236,250 - $(-32,035)
(-604,440)
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
$236,250
-
$
TOTAL RECOMMENDED Savings:
$243,036
Cost:
$154,910
$(-16,338) (-369,739) $98 26 $2,053 496 $6,991 2,696 $13,982 2,696 $236,250 - $(-16,338)
(-369,739)
kWh
$98
26
kW-months/year
$2,053
496
MMBtu
$6,991
2,696
Tgal
$13,982
2,696
Tgal
$236,250
-
$
TOTAL IMPLEMENTED Savings:
$1,163
Cost:
-
$1,065 20,101 $98 26 - - - - - - - - $1,065
20,101
kWh
$98
26
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Primary Raw Material Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Primary Raw Material