Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2019 |
Principal Product | Packed Apples |
NAICS | 111331 - Apple Orchards |
SIC | 0175 - Deciduous Tree Fruits |
Sales | $10,000,000-$50,000,000 |
# of Employees | 115 |
Plant Area (Sq.Ft.) | 183,000 |
Annual Production | 1,000,000 Units |
Production Hrs. Annual | 8,760 |
Location (State) | WA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $185,461 | 10,860,340 | kWh | $0.02 |
TOTAL ENERGY COSTS | $185,461 | |||
RECOMMENDED SAVINGS* | $68,101 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $35,763 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Ancillary Material Cost | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Electricity Fees | Ancillary Material Cost | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS |
Savings: $27,061 Cost: $33,855 |
$(-1,615) | (-65,323) | - | - | - | - | $29,000 | - | $(-324) | - |
$(-1,615) (-65,323) kWh |
- - kW-months/year |
- - $ |
$29,000 - $ |
$(-324) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $31,433 Cost: $68,000 |
- | - | - | - | $31,433 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$31,433 - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $4,330 Cost: $1,100 |
$3,947 | 159,649 | $383 | 219 | - | - | - | - | - | - |
$3,947 159,649 kWh |
$383 219 kW-months/year |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT |
Savings: $3,139 Cost: $2,013 |
$2,539 | 102,796 | $600 | 343 | - | - | - | - | - | - |
$2,539 102,796 kWh |
$600 343 kW-months/year |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,138 Cost: $3,275 |
$1,949 | 78,849 | $189 | 108 | - | - | - | - | - | - |
$1,949 78,849 kWh |
$189 108 kW-months/year |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $68,101 Cost: $108,243 |
$6,820 | 275,971 | $1,172 | 670 | $31,433 | - | $29,000 | - | $(-324) | - | $6,820 275,971 kWh |
$1,172 670 kW-months/year |
$31,433 - $ |
$29,000 - $ |
$(-324) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $35,763 Cost: $69,100 |
$3,947 | 159,649 | $383 | 219 | $31,433 | - | - | - | - | - | $3,947 159,649 kWh |
$383 219 kW-months/year |
$31,433 - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Ancillary Material Cost | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Electricity Fees | Ancillary Material Cost | One-time Revenue or Avoided Cost |