IAC Assessment: OR0727
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0727
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2019
Principal Product Softwood Veneer
NAICS 321212 - Softwood Veneer and Plywood Manufacturing
SIC 2436 - Softwood Veneer And Plywood
Sales $50,000,000-$100,000,000
# of Employees 60
Plant Area (Sq.Ft.) 1,304,000
Annual Production 310,000 Units
Production Hrs. Annual 6,120
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $425,056 8,004,215 kWh $0.05
Electricity Demand $194,359 22,064 kW-months/year $8.81
Electricity Fees $70,222 - $ -
Natural Gas $463,541 90,745 MMBtu $5.11
Fuel Oil #1 $106,190 4,865 MMBtu $21.83
TOTAL ENERGY COSTS $1,259,368
RECOMMENDED SAVINGS* $2,379,640 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,125
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #1 Personnel Changes Administrative Changes Increase in Production Electricity Usage Electricity Demand Fuel Oil #1 Personnel Changes Administrative Changes Increase in Production
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ %
01: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$2,245,906
Cost:
$300,000
- - - - - - - - $23,684 - $2,222,222 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$23,684
-
$
$2,222,222
-
%
02: 2.8227 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION Savings:
$125,609
Cost:
$904,500
$(-8,459) (-154,440) $(-1,252) (-161) $106,190 4,865 $29,130 - - - - - $(-8,459)
(-154,440)
kWh
$(-1,252)
(-161)
kW-months/year
$106,190
4,865
MMBtu
$29,130
-
$
-
-
$
-
-
%
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,870
Cost:
$19,006
$5,269 96,208 $1,601 206 - - - - - - - - $5,269
96,208
kWh
$1,601
206
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
%
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,255
Cost:
$770
$1,255 22,910 - - - - - - - - - - $1,255
22,910
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$2,379,640
Cost:
$1,224,276
$(-1,935) (-35,322) $349 45 $106,190 4,865 $29,130 - $23,684 - $2,222,222 - $(-1,935)
(-35,322)
kWh
$349
45
kW-months/year
$106,190
4,865
MMBtu
$29,130
-
$
$23,684
-
$
$2,222,222
-
%
TOTAL IMPLEMENTED Savings:
$8,125
Cost:
$19,776
$6,524 119,118 $1,601 206 - - - - - - - - $6,524
119,118
kWh
$1,601
206
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ %
Electricity Usage Electricity Demand Fuel Oil #1 Personnel Changes Administrative Changes Increase in Production Electricity Usage Electricity Demand Fuel Oil #1 Personnel Changes Administrative Changes Increase in Production