Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2019 |
Principal Product | Softwood Veneer |
NAICS | 321212 - Softwood Veneer and Plywood Manufacturing |
SIC | 2436 - Softwood Veneer And Plywood |
Sales | $50,000,000-$100,000,000 |
# of Employees | 60 |
Plant Area (Sq.Ft.) | 1,304,000 |
Annual Production | 310,000 Units |
Production Hrs. Annual | 6,120 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $425,056 | 8,004,215 | kWh | $0.05 |
Electricity Demand | $194,359 | 22,064 | kW-months/year | $8.81 |
Electricity Fees | $70,222 | - | $ | - |
Natural Gas | $463,541 | 90,745 | MMBtu | $5.11 |
Fuel Oil #1 | $106,190 | 4,865 | MMBtu | $21.83 |
TOTAL ENERGY COSTS | $1,259,368 | |||
RECOMMENDED SAVINGS* | $2,379,640 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $8,125 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #1 | Personnel Changes | Administrative Changes | Increase in Production | Electricity Usage | Electricity Demand | Fuel Oil #1 | Personnel Changes | Administrative Changes | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $2,245,906 Cost: $300,000 |
- | - | - | - | - | - | - | - | $23,684 | - | $2,222,222 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$23,684 - $ |
$2,222,222 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.8227 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION |
Savings: $125,609 Cost: $904,500 |
$(-8,459) | (-154,440) | $(-1,252) | (-161) | $106,190 | 4,865 | $29,130 | - | - | - | - | - |
$(-8,459) (-154,440) kWh |
$(-1,252) (-161) kW-months/year |
$106,190 4,865 MMBtu |
$29,130 - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $6,870 Cost: $19,006 |
$5,269 | 96,208 | $1,601 | 206 | - | - | - | - | - | - | - | - |
$5,269 96,208 kWh |
$1,601 206 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $1,255 Cost: $770 |
$1,255 | 22,910 | - | - | - | - | - | - | - | - | - | - |
$1,255 22,910 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $2,379,640 Cost: $1,224,276 |
$(-1,935) | (-35,322) | $349 | 45 | $106,190 | 4,865 | $29,130 | - | $23,684 | - | $2,222,222 | - | $(-1,935) (-35,322) kWh |
$349 45 kW-months/year |
$106,190 4,865 MMBtu |
$29,130 - $ |
$23,684 - $ |
$2,222,222 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $8,125 Cost: $19,776 |
$6,524 | 119,118 | $1,601 | 206 | - | - | - | - | - | - | - | - | $6,524 119,118 kWh |
$1,601 206 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #1 | Personnel Changes | Administrative Changes | Increase in Production | Electricity Usage | Electricity Demand | Fuel Oil #1 | Personnel Changes | Administrative Changes | Increase in Production |