Assessment Year 2019
Principal Product Hardwood Plywood
NAICS 321211 - Hardwood Veneer and Plywood Manufacturing
SIC 2435 - Hardwood Veneer And Plywood
Sales $100,000,000-$500,000,000
# of Employees 230
Plant Area (Sq.Ft.) 622,518
Annual Production 100,000,000 Units
Production Hrs. Annual 6,240
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $695,642 17,192,800 kWh $0.04
Electricity Demand $301,449 38,455 kW-months/year $7.84
Electricity Fees $(-51,548) - $ -
TOTAL ENERGY COSTS $945,543
RECOMMENDED SAVINGS* $70,632 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,008
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$29,023
Cost:
$34,574
$20,636 509,540 $8,387 1,019 $20,636
509,540
kWh
$8,387
1,019
kW-months/year
02: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS Savings:
$29,427
Cost:
$34,054
$13,546 334,472 $15,881 1,930 $13,546
334,472
kWh
$15,881
1,930
kW-months/year
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$8,174
Cost:
$4,152
$5,877 145,109 $2,297 279 $5,877
145,109
kWh
$2,297
279
kW-months/year
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,008
Cost:
-
$1,728 42,675 $2,280 277 $1,728
42,675
kWh
$2,280
277
kW-months/year
TOTAL RECOMMENDED Savings:
$70,632
Cost:
$72,780
$41,787 1,031,796 $28,845 3,505 $41,787
1,031,796
kWh
$28,845
3,505
kW-months/year
TOTAL IMPLEMENTED Savings:
$4,008
Cost:
-
$1,728 42,675 $2,280 277 $1,728
42,675
kWh
$2,280
277
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand