IAC logo
IAC Assessment: OR0749
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0749
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2022
Principal Product Shiitake Mycelium Blocks
NAICS 311999 - All Other Miscellaneous Food Manufacturing
SIC 2099 - Food Preparations, Nec
Sales $5,000,000-$10,000,000
# of Employees 37
Plant Area (Sq.Ft.) 85,000
Annual Production 1,500,000 Pounds
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $128,837 2,177,800 kWh $0.06
Electricity Demand $29,475 4,349 kW-months/year $6.78
Electricity Fees $8,598 - $ -
LPG $127,317 8,319 MMBtu $15.30
TOTAL ENERGY COSTS $294,227
RECOMMENDED SAVINGS* $169,624 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $126,102
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG
$ kWh $ kW-months/year $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$999
Cost:
-
$866 13,886 $133 19 - - $866
13,886
kWh
$133
19
kW-months/year
-
-
MMBtu
02: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$43,522
Cost:
$28,094
$(-21,648) (-347,592) $(-6,551) (-933) $71,721 3,285 $(-21,648)
(-347,592)
kWh
$(-6,551)
(-933)
kW-months/year
$71,721
3,285
MMBtu
03: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$3,003
Cost:
$11,329
- - - - $3,003 138 -
-
kWh
-
-
kW-months/year
$3,003
138
MMBtu
04: 2.1224 REPLACE BOILER Savings:
$122,100
Cost:
$1,640,000
- - - - $122,100 5,593 -
-
kWh
-
-
kW-months/year
$122,100
5,593
MMBtu
TOTAL RECOMMENDED Savings:
$169,624
Cost:
$1,679,423
$(-20,782) (-333,706) $(-6,418) (-914) $196,824 9,016 $(-20,782)
(-333,706)
kWh
$(-6,418)
(-914)
kW-months/year
$196,824
9,016
MMBtu
TOTAL IMPLEMENTED Savings:
$126,102
Cost:
$1,651,329
$866 13,886 $133 19 $125,103 5,731 $866
13,886
kWh
$133
19
kW-months/year
$125,103
5,731
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG