Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2022 |
Principal Product | Custom Plywood Panel Products |
NAICS | 321211 - Hardwood Veneer and Plywood Manufacturing |
SIC | 2435 - Hardwood Veneer And Plywood |
Sales | $50,000,000-$100,000,000 |
# of Employees | 360 |
Plant Area (Sq.Ft.) | 255,100 |
Annual Production | 1,600,000 Units |
Production Hrs. Annual | 4,000 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $571,592 | 13,892,760 | kWh | $0.04 |
Electricity Demand | $296,950 | 37,189 | kW-months/year | $7.98 |
Electricity Fees | $63,793 | - | $ | - |
Natural Gas | $155,929 | 35,950 | MMBtu | $4.34 |
TOTAL ENERGY COSTS | $1,220,739 | |||
RECOMMENDED SAVINGS* | $328,748 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Personnel Changes | Electricity Usage | Electricity Demand | Electricity Fees | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $8,607 Cost: - |
$6,559 | 159,187 | $2,048 | 263 | - | - | - | - |
$6,559 159,187 kWh |
$2,048 263 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,128 Cost: - |
$475 | 11,531 | $653 | 84 | - | - | - | - |
$475 11,531 kWh |
$653 84 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $32,591 Cost: $4,338 |
$32,591 | 791,036 | - | - | - | - | - | - |
$32,591 791,036 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.2176 INCREASE USE OF AUTOMATION |
Savings: $149,543 Cost: $65,909 |
- | - | - | - | - | - | $149,543 | - |
- - kWh |
- - kW-months/year |
- - $ |
$149,543 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $87,087 Cost: $87,086 |
$76,649 | 1,860,403 | $10,438 | 1,340 | - | - | - | - |
$76,649 1,860,403 kWh |
$10,438 1,340 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $49,792 Cost: $155,954 |
- | - | - | - | $49,792 | - | - | - |
- - kWh |
- - kW-months/year |
$49,792 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $328,748 Cost: $313,287 |
$116,274 | 2,822,157 | $13,139 | 1,687 | $49,792 | - | $149,543 | - | $116,274 2,822,157 kWh |
$13,139 1,687 kW-months/year |
$49,792 - $ |
$149,543 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Personnel Changes | Electricity Usage | Electricity Demand | Electricity Fees | Personnel Changes |