IAC logo
IAC Assessment: OR0750
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0750
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2022
Principal Product Custom Plywood Panel Products
NAICS 321211 - Hardwood Veneer and Plywood Manufacturing
SIC 2435 - Hardwood Veneer And Plywood
Sales $50,000,000-$100,000,000
# of Employees 360
Plant Area (Sq.Ft.) 255,100
Annual Production 1,600,000 Units
Production Hrs. Annual 4,000
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $571,592 13,892,760 kWh $0.04
Electricity Demand $296,950 37,189 kW-months/year $7.98
Electricity Fees $63,793 - $ -
Natural Gas $155,929 35,950 MMBtu $4.34
TOTAL ENERGY COSTS $1,220,739
RECOMMENDED SAVINGS* $328,748 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$8,607
Cost:
-
$6,559 159,187 $2,048 263 - - - - $6,559
159,187
kWh
$2,048
263
kW-months/year
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,128
Cost:
-
$475 11,531 $653 84 - - - - $475
11,531
kWh
$653
84
kW-months/year
-
-
$
-
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$32,591
Cost:
$4,338
$32,591 791,036 - - - - - - $32,591
791,036
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 3.2176 INCREASE USE OF AUTOMATION Savings:
$149,543
Cost:
$65,909
- - - - - - $149,543 - -
-
kWh
-
-
kW-months/year
-
-
$
$149,543
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$87,087
Cost:
$87,086
$76,649 1,860,403 $10,438 1,340 - - - - $76,649
1,860,403
kWh
$10,438
1,340
kW-months/year
-
-
$
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$49,792
Cost:
$155,954
- - - - $49,792 - - - -
-
kWh
-
-
kW-months/year
$49,792
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$328,748
Cost:
$313,287
$116,274 2,822,157 $13,139 1,687 $49,792 - $149,543 - $116,274
2,822,157
kWh
$13,139
1,687
kW-months/year
$49,792
-
$
$149,543
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes