Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2022 |
Principal Product | Conveying Floors |
NAICS | 333922 - Conveyor and Conveying Equipment Manufacturing |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 240 |
Plant Area (Sq.Ft.) | 270,000 |
Annual Production | 3,000 Units |
Production Hrs. Annual | 6,240 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $144,314 | 2,745,910 | kWh | $0.05 |
Electricity Demand | $86,146 | 10,630 | kW-months/year | $8.10 |
Electricity Fees | $38,254 | - | $ | - |
Natural Gas | $85,662 | 12,247 | MMBtu | $6.99 |
TOTAL ENERGY COSTS | $354,375 | |||
RECOMMENDED SAVINGS* | $90,381 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Water Usage | Administrative Changes | By-product Production | Increase in Production | Electricity Usage | Water Usage | Administrative Changes | By-product Production | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | Tgal | $ | $ | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY |
Savings: $12,526 Cost: $140 |
- | - | - | - | - | - | - | - | $12,526 | - |
- - kWh |
- - Tgal |
- - $ |
- - $ |
$12,526 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $1,956 Cost: $1,175 |
$1,956 | 29,086 | - | - | - | - | - | - | - | - |
$1,956 29,086 kWh |
- - Tgal |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.5111 FILTER AND REUSE HYDRAULIC OIL |
Savings: $74,774 Cost: $48,589 |
- | - | $73 | 25 | $(-734) | - | $75,435 | - | - | - |
- - kWh |
$73 25 Tgal |
$(-734) - $ |
$75,435 - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $1,125 Cost: $1,272 |
$1,125 | 16,730 | - | - | - | - | - | - | - | - |
$1,125 16,730 kWh |
- - Tgal |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $90,381 Cost: $51,176 |
$3,081 | 45,816 | $73 | 25 | $(-734) | - | $75,435 | - | $12,526 | - | $3,081 45,816 kWh |
$73 25 Tgal |
$(-734) - $ |
$75,435 - $ |
$12,526 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - Tgal |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | Tgal | $ | $ | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Water Usage | Administrative Changes | By-product Production | Increase in Production | Electricity Usage | Water Usage | Administrative Changes | By-product Production | Increase in Production |