IAC logo
IAC Assessment: OR0751
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0751
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2022
Principal Product Conveying Floors
NAICS 333922 - Conveyor and Conveying Equipment Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 240
Plant Area (Sq.Ft.) 270,000
Annual Production 3,000 Units
Production Hrs. Annual 6,240
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $144,314 2,745,910 kWh $0.05
Electricity Demand $86,146 10,630 kW-months/year $8.10
Electricity Fees $38,254 - $ -
Natural Gas $85,662 12,247 MMBtu $6.99
TOTAL ENERGY COSTS $354,375
RECOMMENDED SAVINGS* $90,381 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Water Usage Administrative Changes By-product Production Increase in Production Electricity Usage Water Usage Administrative Changes By-product Production Increase in Production
$ kWh $ Tgal $ $ $ $ $ %
01: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$12,526
Cost:
$140
- - - - - - - - $12,526 - -
-
kWh
-
-
Tgal
-
-
$
-
-
$
$12,526
-
%
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,956
Cost:
$1,175
$1,956 29,086 - - - - - - - - $1,956
29,086
kWh
-
-
Tgal
-
-
$
-
-
$
-
-
%
03: 3.5111 FILTER AND REUSE HYDRAULIC OIL Savings:
$74,774
Cost:
$48,589
- - $73 25 $(-734) - $75,435 - - - -
-
kWh
$73
25
Tgal
$(-734)
-
$
$75,435
-
$
-
-
%
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$1,125
Cost:
$1,272
$1,125 16,730 - - - - - - - - $1,125
16,730
kWh
-
-
Tgal
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$90,381
Cost:
$51,176
$3,081 45,816 $73 25 $(-734) - $75,435 - $12,526 - $3,081
45,816
kWh
$73
25
Tgal
$(-734)
-
$
$75,435
-
$
$12,526
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
Tgal
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ Tgal $ $ $ $ $ %
Electricity Usage Water Usage Administrative Changes By-product Production Increase in Production Electricity Usage Water Usage Administrative Changes By-product Production Increase in Production