IAC Assessment: OR0757
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0757
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2022
Principal Product Fruit/vegetable puree
NAICS 311411 - Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037 - Frozen Fruits And Vegetables
Sales $50,000,000-$100,000,000
# of Employees 750
Plant Area (Sq.Ft.) 325,000
Annual Production 112,000,000 Pounds
Production Hrs. Annual 7,200
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $326,718 7,393,127 kWh $0.04
Electricity Demand $252,339 26,919 kW-months/year $9.37
Electricity Fees $46,664 - $ -
Natural Gas $67,439 70,440 MMBtu $0.96
TOTAL ENERGY COSTS $693,160
RECOMMENDED SAVINGS* $320,112 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,612
Cost:
-
$1,147 26,856 $465 45 - - - - $1,147
26,856
kWh
$465
45
kW-months/year
-
-
$
-
-
$
02: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$26,900
Cost:
-
- - - - - - $26,900 - -
-
kWh
-
-
kW-months/year
-
-
$
$26,900
-
$
03: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$97,200
Cost:
$50,000
- - - - $97,200 - - - -
-
kWh
-
-
kW-months/year
$97,200
-
$
-
-
$
04: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$194,400
Cost:
$300,000
- - - - $194,400 - - - -
-
kWh
-
-
kW-months/year
$194,400
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$320,112
Cost:
$350,000
$1,147 26,856 $465 45 $291,600 - $26,900 - $1,147
26,856
kWh
$465
45
kW-months/year
$291,600
-
$
$26,900
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost