IAC logo
IAC Assessment: OR0761
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0761
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2022
Principal Product Short cut stock, long cut stock, wood moldings, wood veneer
NAICS 321212 - Softwood Veneer and Plywood Manufacturing
SIC 2436 - Softwood Veneer And Plywood
Sales $10,000,000-$50,000,000
# of Employees 154
Plant Area (Sq.Ft.) 486,000
Annual Production 32,000,000 Units
Production Hrs. Annual 6,450
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $242,753 5,404,640 kWh $0.04
Electricity Demand $229,468 21,065 kW-months/year $10.89
Electricity Fees $59,577 - $ -
Natural Gas $122,560 16,155 MMBtu $7.59
TOTAL ENERGY COSTS $654,358
RECOMMENDED SAVINGS* $49,096 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,847
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,913
Cost:
$1,078
$1,432 20,704 $481 42 - - - - $1,432
20,704
kWh
$481
42
kW-months/year
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,934
Cost:
$9,934
$7,460 107,792 $2,474 215 - - - - $7,460
107,792
kWh
$2,474
215
kW-months/year
-
-
$
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,236
Cost:
$26,406
- - - - $6,236 - - - -
-
kWh
-
-
kW-months/year
$6,236
-
$
-
-
$
04: 4.463 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS Savings:
$31,013
Cost:
$150,000
$(-13,732) (-198,406) $(-5,655) (-492) - - $50,400 - $(-13,732)
(-198,406)
kWh
$(-5,655)
(-492)
kW-months/year
-
-
$
$50,400
-
$
TOTAL RECOMMENDED Savings:
$49,096
Cost:
$187,418
$(-4,840) (-69,910) $(-2,700) (-235) $6,236 - $50,400 - $(-4,840)
(-69,910)
kWh
$(-2,700)
(-235)
kW-months/year
$6,236
-
$
$50,400
-
$
TOTAL IMPLEMENTED Savings:
$11,847
Cost:
$11,012
$8,892 128,496 $2,955 257 - - - - $8,892
128,496
kWh
$2,955
257
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes