IAC logo
IAC Assessment: OR0767
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0767
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2023
Principal Product Lumber
NAICS 321999 - All Other Miscellaneous Wood Product Manufacturing
SIC 2499 - Wood Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 29
Plant Area (Sq.Ft.) 21,780,000
Annual Production 18,000 Thousand Feet
Production Hrs. Annual 2,040
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $142,997 2,269,800 kWh $0.06
Electricity Demand $38,760 6,460 kW-months/year $6.00
Electricity Fees $3,301 - $ -
Natural Gas $254,857 42,138 MMBtu $6.05
TOTAL ENERGY COSTS $444,688
RECOMMENDED SAVINGS* $497,551 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $473,163
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Primary Product Electricity Usage Electricity Demand Primary Product
$ kWh $ kW-months/year $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,793
Cost:
-
$1,284 20,378 $509 85 - - $1,284
20,378
kWh
$509
85
kW-months/year
-
-
$
02: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT Savings:
$172,773
Cost:
$37,200
- - - - $172,773 - -
-
kWh
-
-
kW-months/year
$172,773
-
$
03: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$300,390
Cost:
$200,000
- - - - $300,390 - -
-
kWh
-
-
kW-months/year
$300,390
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$17,167
Cost:
$14,238
$11,003 174,651 $6,164 1,027 - - $11,003
174,651
kWh
$6,164
1,027
kW-months/year
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,428
Cost:
$5,428
$4,184 66,413 $1,244 207 - - $4,184
66,413
kWh
$1,244
207
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$497,551
Cost:
$256,866
$16,471 261,442 $7,917 1,319 $473,163 - $16,471
261,442
kWh
$7,917
1,319
kW-months/year
$473,163
-
$
TOTAL IMPLEMENTED Savings:
$473,163
Cost:
$237,200
- - - - $473,163 - -
-
kWh
-
-
kW-months/year
$473,163
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Primary Product Electricity Usage Electricity Demand Primary Product