IAC Assessment: OR0774
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0774
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2023
Principal Product Sheet Glass
NAICS 327211 - Flat Glass Manufacturing
SIC 3211 - Flat Glass
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 75,000
Annual Production 4,400,000 Pounds
Production Hrs. Annual 3,744
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $127,360 1,800,354 kWh $0.07
Electricity Demand $65,242 8,593 kW-months/year $7.59
Electricity Fees $17,186 - $ -
Natural Gas $13,248 1,022 MMBtu $12.96
TOTAL ENERGY COSTS $223,036
RECOMMENDED SAVINGS* $62,215 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$27,206
Cost:
$88,913
$4,651 46,629 - - $22,555 1,973 $4,651
46,629
kWh
-
-
kW-months/year
$22,555
1,973
MMBtu
02: 2.1122 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT Savings:
$22,803
Cost:
$17,436
- - - - $22,803 1,995 -
-
kWh
-
-
kW-months/year
$22,803
1,995
MMBtu
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$10,951
Cost:
$10,710
$10,951 109,791 - - - - $10,951
109,791
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$1,255
Cost:
$1,480
$992 9,948 $263 18 - - $992
9,948
kWh
$263
18
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$62,215
Cost:
$118,539
$16,594 166,368 $263 18 $45,358 3,968 $16,594
166,368
kWh
$263
18
kW-months/year
$45,358
3,968
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas