Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2023
Principal Product Frozen blueberries, onions, bean sprouts, blackberries
NAICS 311411 - Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037 - Frozen Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 110,000
Annual Production 30,000,000 Pounds
Production Hrs. Annual 5,304
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $242,401 5,154,152 kWh $0.05
Electricity Demand $217,602 17,961 kW-months/year $12.12
Electricity Fees $87,682 - $ -
Natural Gas $29,791 3,679 MMBtu $8.10
TOTAL ENERGY COSTS $724,971
RECOMMENDED SAVINGS* $52,952 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,517
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS Savings:
$35,316
Cost:
$540,000
$(-3,720) (-75,000) - - $39,036 104,897 $(-3,720)
(-75,000)
kWh
-
-
kW-months/year
$39,036
104,897
lb
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$13,517
Cost:
$2,000
$9,329 188,042 $4,188 315 - - $9,329
188,042
kWh
$4,188
315
kW-months/year
-
-
lb
03: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$2,453
Cost:
$14,157
$2,453 49,448 - - - - $2,453
49,448
kWh
-
-
kW-months/year
-
-
lb
04: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$1,666
Cost:
$24,285
$1,666 35,790 - - - - $1,666
35,790
kWh
-
-
kW-months/year
-
-
lb
TOTAL RECOMMENDED Savings:
$52,952
Cost:
$580,442
$9,728 198,280 $4,188 315 $39,036 104,897 $9,728
198,280
kWh
$4,188
315
kW-months/year
$39,036
104,897
lb
TOTAL IMPLEMENTED Savings:
$13,517
Cost:
$2,000
$9,329 188,042 $4,188 315 - - $9,329
188,042
kWh
$4,188
315
kW-months/year
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)