IAC logo
IAC Assessment: OR0784
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0784
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2023
Principal Product Effluent
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 89
Plant Area (Sq.Ft.) 3,571,920
Annual Production 11,977 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $654,204 12,510,000 kWh $0.05
Electricity Demand $162,651 23,904 kW-months/year $6.80
Electricity Fees $34,407 - $ -
Natural Gas $249,316 31,306 MMBtu $7.96
TOTAL ENERGY COSTS $1,602,691
RECOMMENDED SAVINGS* $408,659 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,041
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Primary Raw Material Water Consumption Electricity Usage Electricity Demand Other Liquid (non-haz) Primary Raw Material Water Consumption
$ kWh $ kW-months/year $ gal $ $ $ Tgal
01: 3.3133 USE OTHER WASTE CONCENTRATION METHODS Savings:
$61,484
Cost:
$125,000
$61,484 1,175,820 - - - - - - - - $61,484
1,175,820
kWh
-
-
kW-months/year
-
-
gal
-
-
$
-
-
Tgal
02: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$343,134
Cost:
$700,000
$(-3,769) (-72,085) - - $502,113 218,310 $(-23,242) - $(-131,968) - $(-3,769)
(-72,085)
kWh
-
-
kW-months/year
$502,113
218,310
gal
$(-23,242)
-
$
$(-131,968)
-
Tgal
03: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$4,041
Cost:
$12,113
$2,909 54,566 $1,132 167 - - - - - - $2,909
54,566
kWh
$1,132
167
kW-months/year
-
-
gal
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$408,659
Cost:
$837,113
$60,624 1,158,301 $1,132 167 $502,113 218,310 $(-23,242) - $(-131,968) - $60,624
1,158,301
kWh
$1,132
167
kW-months/year
$502,113
218,310
gal
$(-23,242)
-
$
$(-131,968)
-
Tgal
TOTAL IMPLEMENTED Savings:
$4,041
Cost:
$12,113
$2,909 54,566 $1,132 167 - - - - - - $2,909
54,566
kWh
$1,132
167
kW-months/year
-
-
gal
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ gal $ $ $ Tgal
Electricity Usage Electricity Demand Other Liquid (non-haz) Primary Raw Material Water Consumption Electricity Usage Electricity Demand Other Liquid (non-haz) Primary Raw Material Water Consumption