IAC Assessment: OR0788
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2024
Principal Product Phenolic Resins
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales $50,000,000-$100,000,000
# of Employees 30
Plant Area (Sq.Ft.) 210,000
Annual Production 154,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $215,791 5,101,440 kWh $0.04
Electricity Demand $83,959 9,718 kW-months/year $8.64
Electricity Fees $(-5,476) - $ -
Natural Gas $578,760 78,528 MMBtu $7.37
TOTAL ENERGY COSTS $873,034
RECOMMENDED SAVINGS* $169,945 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ MMBtu $ $ $ $
01: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$126,866
Cost:
$607,450
- - $126,866 17,451 - - - - -
-
kWh
$126,866
17,451
MMBtu
-
-
$
-
-
$
02: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$25,469
Cost:
$59,617
$1,431 33,826 - - $10,000 - $14,038 - $1,431
33,826
kWh
-
-
MMBtu
$10,000
-
$
$14,038
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,448
Cost:
$30,426
$7,448 176,076 - - - - - - $7,448
176,076
kWh
-
-
MMBtu
-
-
$
-
-
$
04: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$6,183
Cost:
$10,497
$(-1,926) (-45,525) $8,109 1,115 - - - - $(-1,926)
(-45,525)
kWh
$8,109
1,115
MMBtu
-
-
$
-
-
$
05: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$3,766
Cost:
$18,699
- - $3,766 518 - - - - -
-
kWh
$3,766
518
MMBtu
-
-
$
-
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$213
Cost:
$6,559
$213 4,942 - - - - - - $213
4,942
kWh
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$169,945
Cost:
$733,248
$7,166 169,319 $138,741 19,084 $10,000 - $14,038 - $7,166
169,319
kWh
$138,741
19,084
MMBtu
$10,000
-
$
$14,038
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost