IAC logo
IAC Assessment: OR0792
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0792
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2024
Principal Product Meat
NAICS 311612 - Meat Processed from Carcasses
SIC 2011 - Meat Packing Plants
Sales $100,000,000-$500,000,000
# of Employees 552
Plant Area (Sq.Ft.) 453,000
Annual Production 30,000,000 Pounds
Production Hrs. Annual 4,250
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,290,325 22,140,366 kWh $0.10
Electricity Demand $152,610 53,416 kW-months/year $2.86
Electricity Fees $200,333 - $ -
Natural Gas $1,428,158 196,998 MMBtu $7.25
TOTAL ENERGY COSTS $4,071,426
RECOMMENDED SAVINGS* $466,054 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,993
Cost:
-
$1,993 19,261 - - - - - - - - $1,993
19,261
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$15,081
Cost:
$1,119
$14,062 135,930 $1,019 356 - - - - - - $14,062
135,930
kWh
$1,019
356
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$37,200
Cost:
$18,409
$37,200 359,593 - - - - - - - - $37,200
359,593
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$6,357
Cost:
$3,090
- - - - $6,357 899 - - - - -
-
kWh
-
-
kW-months/year
$6,357
899
MMBtu
-
-
$
-
-
$
05: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$7,380
Cost:
$6,624
- - - - $1,984 281 - - $5,396 - -
-
kWh
-
-
kW-months/year
$1,984
281
MMBtu
-
-
$
$5,396
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,667
Cost:
$3,106
$2,667 25,777 - - - - - - - - $2,667
25,777
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 4.231 PURCHASE EQUIPMENT INSTEAD OF LEASING Savings:
$395,376
Cost:
$1,242,029
- - - - - - $395,376 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$395,376
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$466,054
Cost:
$1,274,377
$55,922 540,561 $1,019 356 $8,341 1,180 $395,376 - $5,396 - $55,922
540,561
kWh
$1,019
356
kW-months/year
$8,341
1,180
MMBtu
$395,376
-
$
$5,396
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost