Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2024 |
Principal Product | Cheese |
NAICS | 311513 - Cheese Manufacturing |
SIC | 2022 - Cheese, Natural And Processed |
Sales | $10,000,000-$50,000,000 |
# of Employees | 242 |
Plant Area (Sq.Ft.) | 267,546 |
Annual Production | 182,500,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $894,706 | 20,042,400 | kWh | $0.04 |
Electricity Demand | $212,580 | 32,639 | kW-months/year | $6.51 |
Electricity Fees | $13,213 | - | $ | - |
Natural Gas | $141,624 | 14,738 | MMBtu | $9.61 |
Other Energy | $1,882,993 | 200,971 | MMBtu | $9.37 |
TOTAL ENERGY COSTS | $3,145,116 | |||
RECOMMENDED SAVINGS* | $161,602 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Energy | Electricity Usage | Electricity Demand | Natural Gas | Other Energy | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $2,039 Cost: - |
$2,039 | 45,687 | - | - | - | - | - | - |
$2,039 45,687 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $10,927 Cost: $3,514 |
- | - | - | - | $10,927 | 1,186 | - | - |
- - kWh |
- - kW-months/year |
$10,927 1,186 MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $32,971 Cost: $41,770 |
- | - | - | - | - | - | $32,971 | 2,620 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$32,971 2,620 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $112,659 Cost: $399,900 |
$81,419 | 1,823,594 | $31,240 | 4,799 | - | - | - | - |
$81,419 1,823,594 kWh |
$31,240 4,799 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,006 Cost: $11,189 |
$2,467 | 55,259 | $539 | 83 | - | - | - | - |
$2,467 55,259 kWh |
$539 83 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $161,602 Cost: $456,373 |
$85,925 | 1,924,540 | $31,779 | 4,882 | $10,927 | 1,186 | $32,971 | 2,620 | $85,925 1,924,540 kWh |
$31,779 4,882 kW-months/year |
$10,927 1,186 MMBtu |
$32,971 2,620 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Energy | Electricity Usage | Electricity Demand | Natural Gas | Other Energy |