IAC Assessment: OR0802
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0802
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2024
Principal Product Powdered corn
NAICS 311423 - Dried and Dehydrated Food Manufacturing
SIC 2034 - Dehydrated Fruits, Vegetables, Soups
Sales $10,000,000-$50,000,000
# of Employees 45
Plant Area (Sq.Ft.) 48,000
Annual Production 2,790,000 Pounds
Production Hrs. Annual 5,208
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $102,801 1,599,900 kWh $0.06
Electricity Demand $60,782 4,324 kW-months/year $14.06
Electricity Fees $16,463 - $ -
Natural Gas $223,379 25,444 MMBtu $8.78
TOTAL ENERGY COSTS $403,425
RECOMMENDED SAVINGS* $42,755 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,248
Cost:
$147
$1,248 19,428 - - - - $1,248
19,428
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,952
Cost:
$500
- - - - $2,952 347 -
-
kWh
-
-
kW-months/year
$2,952
347
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,483
Cost:
$499
$983 15,303 $499 36 - - $983
15,303
kWh
$499
36
kW-months/year
-
-
MMBtu
04: 2.1224 REPLACE BOILER Savings:
$37,073
Cost:
$222,038
$4,583 71,332 $668 48 $31,821 3,739 $4,583
71,332
kWh
$668
48
kW-months/year
$31,821
3,739
MMBtu
TOTAL RECOMMENDED Savings:
$42,755
Cost:
$223,184
$6,815 106,063 $1,168 84 $34,773 4,086 $6,815
106,063
kWh
$1,168
84
kW-months/year
$34,773
4,086
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas