IAC Assessment: PV0005
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: PV0005
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Prairie View, A&M
Assessment Year 1985
Principal Product FAB. STEEL & ALLOY PRDTS
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $1,000,000-$5,000,000
# of Employees 25
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 2,000
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $13,927 160,903 kWh $0.09
TOTAL ENERGY COSTS $13,927
RECOMMENDED SAVINGS* $4,271 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$437
Cost:
$17
$437 4,982 $437
4,982
kWh
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,834
Cost:
-
$3,834 56,272 $3,834
56,272
kWh
TOTAL RECOMMENDED Savings:
$4,271
Cost:
$17
$4,271 61,254 $4,271
61,254
kWh
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - -
-
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage