Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Rutgers, State Univ. of NJ |
---|---|
Assessment Year | 1987 |
Principal Product | SALICYLALDEHIDE ETC. |
NAICS | n/a |
SIC | 2821 - Plastics Materials And Resins |
Sales | $10,000,000-$50,000,000 |
# of Employees | 158 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 22,400,000 Pounds |
Production Hrs. Annual | 8,400 |
Location (State) | NJ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $458,163 | 6,178,488 | kWh | $0.07 |
Natural Gas | $510,742 | 149,842 | MMBtu | $3.41 |
Fuel Oil #6 | $79,534 | 28,986 | MMBtu | $2.74 |
TOTAL ENERGY COSTS | $1,048,439 | |||
RECOMMENDED SAVINGS* | $145,266 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $143,356 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #6 | Administrative Changes | Electricity Usage | Natural Gas | Fuel Oil #6 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $6,895 Cost: $7,500 |
- | - | $6,895 | 1,155 | - | - | - | - |
- - kWh |
$6,895 1,155 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $88,019 Cost: $30,000 |
- | - | $81,213 | 24,610 | $13,056 | 4,758 | $(-6,250) | - |
- - kWh |
$81,213 24,610 MMBtu |
$13,056 4,758 MMBtu |
$(-6,250) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $756 Cost: $72 |
$756 | 10,258 | - | - | - | - | - | - |
$756 10,258 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4312 IMPROVE LUBRICATION PRACTICES |
Savings: $1,154 Cost: - |
$1,154 | 15,533 | - | - | - | - | - | - |
$1,154 15,533 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $48,442 Cost: $750 |
- | - | $47,647 | 14,410 | $795 | 290 | - | - |
- - kWh |
$47,647 14,410 MMBtu |
$795 290 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $145,266 Cost: $38,322 |
$1,910 | 25,791 | $135,755 | 40,175 | $13,851 | 5,048 | $(-6,250) | - | $1,910 25,791 kWh |
$135,755 40,175 MMBtu |
$13,851 5,048 MMBtu |
$(-6,250) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $143,356 Cost: $38,250 |
- | - | $135,755 | 40,175 | $13,851 | 5,048 | $(-6,250) | - | - - kWh |
$135,755 40,175 MMBtu |
$13,851 5,048 MMBtu |
$(-6,250) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #6 | Administrative Changes | Electricity Usage | Natural Gas | Fuel Oil #6 | Administrative Changes |