IAC logo
IAC Assessment: RU0010
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0010
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1987
Principal Product CAMPING EQUIPMENT
NAICS n/a
SIC 2394 - Canvas And Related Products
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 0
Annual Production 822,000 Pieces
Production Hrs. Annual 2,080
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $41,918 427,315 kWh $0.10
Natural Gas $20,511 3,407 MMBtu $6.02
TOTAL ENERGY COSTS $62,429
RECOMMENDED SAVINGS* $4,096 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,428
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$556
Cost:
$400
$556 5,569 - - $556
5,569
kWh
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$600
Cost:
-
$600 6,155 - - $600
6,155
kWh
-
-
MMBtu
03: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$120
Cost:
-
$120 1,172 - - $120
1,172
kWh
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$12
Cost:
-
$12 293 - - $12
293
kWh
-
-
MMBtu
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$696
Cost:
$450
- - $696 116 -
-
kWh
$696
116
MMBtu
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,458
Cost:
$2,250
- - $1,458 243 -
-
kWh
$1,458
243
MMBtu
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$654
Cost:
$316
$654 6,741 - - $654
6,741
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$4,096
Cost:
$3,416
$1,942 19,930 $2,154 359 $1,942
19,930
kWh
$2,154
359
MMBtu
TOTAL IMPLEMENTED Savings:
$1,428
Cost:
$450
$732 7,620 $696 116 $732
7,620
kWh
$696
116
MMBtu
Savings
Cost
$ kWh $ MMBtu