IAC Assessment: RU0060
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0060
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1989
Principal Product PRESTRESSED CONCRETE
NAICS n/a
SIC 3272 - Concrete Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 175
Plant Area (Sq.Ft.) 0
Annual Production 200 Thousand Feet
Production Hrs. Annual 5,049
Location (State) MD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $269,636 4,149,473 kWh $0.06
Fuel Oil #4 $252,348 83,805 MMBtu $3.01
TOTAL ENERGY COSTS $521,984
RECOMMENDED SAVINGS* $69,509 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $63,653
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #4 Electricity Usage Fuel Oil #4
$ kWh $ MMBtu
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$20,786
Cost:
-
- - $20,786 6,905 -
-
kWh
$20,786
6,905
MMBtu
02: 2.5121 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH Savings:
$18,359
Cost:
$16,835
- - $18,359 6,099 -
-
kWh
$18,359
6,099
MMBtu
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$5,856
Cost:
$6,900
- - $5,856 1,945 -
-
kWh
$5,856
1,945
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,256
Cost:
-
$11,256 173,212 - - $11,256
173,212
kWh
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,180
Cost:
$102
$5,180 79,719 - - $5,180
79,719
kWh
-
-
MMBtu
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$8,072
Cost:
$1,500
- - $8,072 2,682 -
-
kWh
$8,072
2,682
MMBtu
TOTAL RECOMMENDED Savings:
$69,509
Cost:
$25,337
$16,436 252,931 $53,073 17,631 $16,436
252,931
kWh
$53,073
17,631
MMBtu
TOTAL IMPLEMENTED Savings:
$63,653
Cost:
$18,437
$16,436 252,931 $47,217 15,686 $16,436
252,931
kWh
$47,217
15,686
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #4 Electricity Usage Fuel Oil #4