IAC logo
IAC Assessment: RU0066
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0066
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1989
Principal Product CONCRETE PIPE
NAICS n/a
SIC 3272 - Concrete Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 145
Plant Area (Sq.Ft.) 0
Annual Production 300,000 Tons
Production Hrs. Annual 4,992
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $273,312 3,247,655 kWh $0.08
Natural Gas $136,783 28,896 MMBtu $4.73
TOTAL ENERGY COSTS $410,095
RECOMMENDED SAVINGS* $51,837 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,549
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$25,758
Cost:
$105,000
$29,510 187,280 $(-3,752) (-798) $29,510
187,280
kWh
$(-3,752)
(-798)
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$9,106
Cost:
$102
$9,106 108,441 - - $9,106
108,441
kWh
-
-
MMBtu
03: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$3,064
Cost:
$800
$3,064 36,635 - - $3,064
36,635
kWh
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,791
Cost:
-
$2,791 33,118 - - $2,791
33,118
kWh
-
-
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,509
Cost:
-
$1,509 17,878 - - $1,509
17,878
kWh
-
-
MMBtu
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$9,609
Cost:
$4,396
$(-183) (-2,345) $9,792 2,083 $(-183)
(-2,345)
kWh
$9,792
2,083
MMBtu
TOTAL RECOMMENDED Savings:
$51,837
Cost:
$110,298
$45,797 381,007 $6,040 1,285 $45,797
381,007
kWh
$6,040
1,285
MMBtu
TOTAL IMPLEMENTED Savings:
$28,549
Cost:
$105,000
$32,301 220,398 $(-3,752) (-798) $32,301
220,398
kWh
$(-3,752)
(-798)
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas