IAC Assessment: RU0075
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0075
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1989
Principal Product PAPERBOARD & EXTRUSIONS
NAICS n/a
SIC 2672 - Paper Coated And Laminated, Nec
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 0
Annual Production 92,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $166,219 1,975,088 kWh $0.08
Natural Gas $18,360 3,402 MMBtu $5.40
TOTAL ENERGY COSTS $184,579
RECOMMENDED SAVINGS* $17,031 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,281
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,443
Cost:
$650
$2,443 29,015 - - $2,443
29,015
kWh
-
-
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,281
Cost:
-
$3,281 38,980 - - $3,281
38,980
kWh
-
-
MMBtu
03: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$780
Cost:
$800
$780 9,379 - - $780
9,379
kWh
-
-
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,338
Cost:
$218
$2,338 27,843 - - $2,338
27,843
kWh
-
-
MMBtu
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,089
Cost:
$80
$1,089 12,896 - - $1,089
12,896
kWh
-
-
MMBtu
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,572
Cost:
$3,800
- - $2,572 476 -
-
kWh
$2,572
476
MMBtu
07: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$4,528
Cost:
$6,660
$(-656) (-7,913) $5,184 960 $(-656)
(-7,913)
kWh
$5,184
960
MMBtu
TOTAL RECOMMENDED Savings:
$17,031
Cost:
$12,208
$9,275 110,200 $7,756 1,436 $9,275
110,200
kWh
$7,756
1,436
MMBtu
TOTAL IMPLEMENTED Savings:
$3,281
Cost:
-
$3,281 38,980 - - $3,281
38,980
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas