IAC Assessment: RU0100
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0100
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1990
Principal Product FABRICATED WIRE PRODUCTS
NAICS n/a
SIC 3496 - Misc. Fabricated Wire Products
Sales $50,000,000-$100,000,000
# of Employees 135
Plant Area (Sq.Ft.) 0
Annual Production 4,700,000 Pieces
Production Hrs. Annual 2,000
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $97,918 1,066,823 kWh $0.09
Natural Gas $9,724 1,900 MMBtu $5.12
Fuel Oil #4 $19,632 5,184 MMBtu $3.79
TOTAL ENERGY COSTS $127,274
RECOMMENDED SAVINGS* $10,512 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,512
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #4 Electricity Usage Fuel Oil #4
$ kWh $ MMBtu
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$410
Cost:
-
$410 4,396 - - $410
4,396
kWh
-
-
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$431
Cost:
$419
$431 4,689 - - $431
4,689
kWh
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,924
Cost:
$5,255
- - $3,924 1,037 -
-
kWh
$3,924
1,037
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,447
Cost:
-
$1,447 15,826 - - $1,447
15,826
kWh
-
-
MMBtu
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$4,300
Cost:
$239
- - $4,300 1,136 -
-
kWh
$4,300
1,136
MMBtu
TOTAL RECOMMENDED Savings:
$10,512
Cost:
$5,913
$2,288 24,911 $8,224 2,173 $2,288
24,911
kWh
$8,224
2,173
MMBtu
TOTAL IMPLEMENTED Savings:
$10,512
Cost:
$5,913
$2,288 24,911 $8,224 2,173 $2,288
24,911
kWh
$8,224
2,173
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #4 Electricity Usage Fuel Oil #4