Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Rutgers, State Univ. of NJ |
---|---|
Assessment Year | 1990 |
Principal Product | FABRICATED WIRE PRODUCTS |
NAICS | n/a |
SIC | 3496 - Misc. Fabricated Wire Products |
Sales | $50,000,000-$100,000,000 |
# of Employees | 135 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 4,700,000 Pieces |
Production Hrs. Annual | 2,000 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $97,918 | 1,066,823 | kWh | $0.09 |
Natural Gas | $9,724 | 1,900 | MMBtu | $5.12 |
Fuel Oil #4 | $19,632 | 5,184 | MMBtu | $3.79 |
TOTAL ENERGY COSTS | $127,274 | |||
RECOMMENDED SAVINGS* | $10,512 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,512 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #4 | Electricity Usage | Fuel Oil #4 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $410 Cost: - |
$410 | 4,396 | - | - |
$410 4,396 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $431 Cost: $419 |
$431 | 4,689 | - | - |
$431 4,689 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $3,924 Cost: $5,255 |
- | - | $3,924 | 1,037 |
- - kWh |
$3,924 1,037 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,447 Cost: - |
$1,447 | 15,826 | - | - |
$1,447 15,826 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $4,300 Cost: $239 |
- | - | $4,300 | 1,136 |
- - kWh |
$4,300 1,136 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $10,512 Cost: $5,913 |
$2,288 | 24,911 | $8,224 | 2,173 | $2,288 24,911 kWh |
$8,224 2,173 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,512 Cost: $5,913 |
$2,288 | 24,911 | $8,224 | 2,173 | $2,288 24,911 kWh |
$8,224 2,173 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #4 | Electricity Usage | Fuel Oil #4 |