IAC Assessment: SD0121
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0121
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1995
Principal Product Fabricated Metal Product
NAICS n/a
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 320
Plant Area (Sq.Ft.) 260,000
Annual Production 5,500 Units
Production Hrs. Annual 4,250
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $610,225 7,131,594 kWh $0.09
Natural Gas $49,431 8,781 MMBtu $5.63
TOTAL ENERGY COSTS $667,569
RECOMMENDED SAVINGS* $23,338 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,756
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)
$ kWh $ MMBtu $ lb
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$3,420
Cost:
$7,500
$3,420 69,754 - - - - $3,420
69,754
kWh
-
-
MMBtu
-
-
lb
02: 2.2421 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER Savings:
$3,648
Cost:
$977
- - $3,648 648 - - -
-
kWh
$3,648
648
MMBtu
-
-
lb
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$656
Cost:
$702
- - $656 117 - - -
-
kWh
$656
117
MMBtu
-
-
lb
04: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN Savings:
$664
Cost:
$15
- - $664 118 - - -
-
kWh
$664
118
MMBtu
-
-
lb
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,118
Cost:
$1,583
$4,118 45,721 - - - - $4,118
45,721
kWh
-
-
MMBtu
-
-
lb
06: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$1,489
Cost:
$800
$1,489 19,050 - - - - $1,489
19,050
kWh
-
-
MMBtu
-
-
lb
07: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$1,093
Cost:
$90
$1,093 14,947 - - - - $1,093
14,947
kWh
-
-
MMBtu
-
-
lb
08: 2.7134 USE PHOTOCELL CONTROLS Savings:
$337
Cost:
$135
$337 2,931 - - - - $337
2,931
kWh
-
-
MMBtu
-
-
lb
09: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$6,480
Cost:
-
- - - - $6,480 86,400 -
-
kWh
-
-
MMBtu
$6,480
86,400
lb
10: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,433
Cost:
-
- - - - $1,433 21,650 -
-
kWh
-
-
MMBtu
$1,433
21,650
lb
TOTAL RECOMMENDED Savings:
$23,338
Cost:
$11,802
$10,457 152,403 $4,968 883 $7,913 108,050 $10,457
152,403
kWh
$4,968
883
MMBtu
$7,913
108,050
lb
TOTAL IMPLEMENTED Savings:
$20,756
Cost:
$10,912
$7,875 118,406 $4,968 883 $7,913 108,050 $7,875
118,406
kWh
$4,968
883
MMBtu
$7,913
108,050
lb
Savings
Cost
$ kWh $ MMBtu $ lb
Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)