IAC logo
IAC Assessment: SD0175
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0175
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1997
Principal Product Fire Extinguishers for aircraft
NAICS n/a
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 220
Plant Area (Sq.Ft.) 73,800
Annual Production 9,600 Pieces
Production Hrs. Annual 5,400
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $116,472 1,748,828 kWh $0.07
Electricity Demand $72,100 5,656 kW-months/year $12.75
Natural Gas $7,624 1,300 MMBtu $5.86
TOTAL ENERGY COSTS $196,196
RECOMMENDED SAVINGS* $193,685 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $191,896
#|Description Savings
Cost
Status Electricity Usage Other Liquid (non-haz) Solid Waste (haz) Administrative Changes Primary Raw Material Electricity Usage Other Liquid (non-haz) Solid Waste (haz) Administrative Changes Primary Raw Material
$ kWh $ gal $ lb $ $ $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$19,778
Cost:
$6,900
$19,778 295,135 - - - - - - - - $19,778
295,135
kWh
-
-
gal
-
-
lb
-
-
$
-
-
$
02: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$2,240
Cost:
$6,840
$2,240 33,411 - - - - - - - - $2,240
33,411
kWh
-
-
gal
-
-
lb
-
-
$
-
-
$
03: 3.1175 USE A DIFFERENT OR RECYCLED RAW MATERIAL Savings:
$81,900
Cost:
-
- - - - - - - - $81,900 - -
-
kWh
-
-
gal
-
-
lb
-
-
$
$81,900
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$21,425
Cost:
$7,000
- - - - $21,425 500,000 - - - - -
-
kWh
-
-
gal
$21,425
500,000
lb
-
-
$
-
-
$
05: 3.8224 CONVERT TO LESS TOXIC HYDROCARBON CLEANERS Savings:
$6,658
Cost:
-
- - $6,658 492 - - - - - - -
-
kWh
$6,658
492
gal
-
-
lb
-
-
$
-
-
$
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$6,325
Cost:
$9,000
- - - - - - $6,325 - - - -
-
kWh
-
-
gal
-
-
lb
$6,325
-
$
-
-
$
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,789
Cost:
-
- - $1,789 300 - - - - - - -
-
kWh
$1,789
300
gal
-
-
lb
-
-
$
-
-
$
08: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$53,570
Cost:
-
- - - - - - $53,570 - - - -
-
kWh
-
-
gal
-
-
lb
$53,570
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$193,685
Cost:
$29,740
$22,018 328,546 $8,447 792 $21,425 500,000 $59,895 - $81,900 - $22,018
328,546
kWh
$8,447
792
gal
$21,425
500,000
lb
$59,895
-
$
$81,900
-
$
TOTAL IMPLEMENTED Savings:
$191,896
Cost:
$29,740
$22,018 328,546 $6,658 492 $21,425 500,000 $59,895 - $81,900 - $22,018
328,546
kWh
$6,658
492
gal
$21,425
500,000
lb
$59,895
-
$
$81,900
-
$
Savings
Cost
$ kWh $ gal $ lb $ $ $ $
Electricity Usage Other Liquid (non-haz) Solid Waste (haz) Administrative Changes Primary Raw Material Electricity Usage Other Liquid (non-haz) Solid Waste (haz) Administrative Changes Primary Raw Material