IAC logo
IAC Assessment: SD0188
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0188
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1998
Principal Product Commercial printing for entertainment industry
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 20,000
Annual Production 0 Units
Production Hrs. Annual 5,336
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $138,749 2,423,505 kWh $0.06
Electricity Demand $9,076 6,840 kW-months/year $1.33
TOTAL ENERGY COSTS $147,825
RECOMMENDED SAVINGS* $682,248 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,191
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Primary Product Electricity Usage Electricity Demand Administrative Changes Primary Product
$ kWh $ kW-months/year $ $ $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$6,365
Cost:
$3,993
$5,950 104,338 $415 312 - - - - $5,950
104,338
kWh
$415
312
kW-months/year
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,284
Cost:
-
$5,948 104,338 $336 253 - - - - $5,948
104,338
kWh
$336
253
kW-months/year
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$807
Cost:
$405
$807 14,068 - - - - - - $807
14,068
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$7,100
Cost:
$8,500
- - - - $7,100 - - - -
-
kWh
-
-
kW-months/year
$7,100
-
$
-
-
$
05: 3.2171 USE AN AUTOMATIC PLATE PROCESSOR Savings:
$656,267
Cost:
$405,000
- - - - - - $656,267 - -
-
kWh
-
-
kW-months/year
-
-
$
$656,267
-
$
06: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$5,425
Cost:
$7,000
- - - - $5,425 - - - -
-
kWh
-
-
kW-months/year
$5,425
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$682,248
Cost:
$424,898
$12,705 222,744 $751 565 $12,525 - $656,267 - $12,705
222,744
kWh
$751
565
kW-months/year
$12,525
-
$
$656,267
-
$
TOTAL IMPLEMENTED Savings:
$14,191
Cost:
$8,905
$6,755 118,406 $336 253 $7,100 - - - $6,755
118,406
kWh
$336
253
kW-months/year
$7,100
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Administrative Changes Primary Product Electricity Usage Electricity Demand Administrative Changes Primary Product