IAC logo
IAC Assessment: SD0207
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0207
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1998
Principal Product Formed Metal products
NAICS n/a
SIC 3469 - Metal Stampings, Nec
Sales $10,000,000-$50,000,000
# of Employees 76
Plant Area (Sq.Ft.) 70,000
Annual Production 0 Units
Production Hrs. Annual 4,420
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $187,233 2,713,072 kWh $0.07
Electricity Demand $55,977 6,883 kW-months/year $8.13
Natural Gas $31,977 5,825 MMBtu $5.49
TOTAL ENERGY COSTS $281,385
RECOMMENDED SAVINGS* $77,301 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$36,824
Cost:
$4,285
- - $8,232 1,013 $28,592 1,414 - - - - - - -
-
kWh
$8,232
1,013
kW-months/year
$28,592
1,414
MMBtu
-
-
Tgal
-
-
gal
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$14,302
Cost:
-
- - - - $14,302 2,600 - - - - - - -
-
kWh
-
-
kW-months/year
$14,302
2,600
MMBtu
-
-
Tgal
-
-
gal
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$7,246
Cost:
$1,800
- - $1,756 216 $5,490 271 - - - - - - -
-
kWh
$1,756
216
kW-months/year
$5,490
271
MMBtu
-
-
Tgal
-
-
gal
-
-
$
04: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$2,456
Cost:
$895
$1,334 19,343 $1,122 138 - - - - - - - - $1,334
19,343
kWh
$1,122
138
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$254
Cost:
-
$205 2,931 $49 6 - - - - - - - - $205
2,931
kWh
$49
6
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
06: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$2,126
Cost:
$300
- - - - - - $2,126 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,126
-
Tgal
-
-
gal
-
-
$
07: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME Savings:
$12,929
Cost:
$8,000
- - - - - - - - $12,929 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$12,929
-
gal
-
-
$
08: 4.7110 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$1,164
Cost:
-
- - - - - - - - - - $1,164 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$1,164
-
$
TOTAL RECOMMENDED Savings:
$77,301
Cost:
$15,280
$1,539 22,274 $11,159 1,373 $48,384 4,285 $2,126 - $12,929 - $1,164 - $1,539
22,274
kWh
$11,159
1,373
kW-months/year
$48,384
4,285
MMBtu
$2,126
-
Tgal
$12,929
-
gal
$1,164
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Administrative Changes