IAC logo
IAC Assessment: SD0209
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0209
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1998
Principal Product Carbon fiber golf shafts
NAICS n/a
SIC 3949 - Sporting And Athletic Goods, Nec
Sales $10,000,000-$50,000,000
# of Employees 275
Plant Area (Sq.Ft.) 75,000
Annual Production 15,000,000 Pieces
Production Hrs. Annual 6,326
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $154,869 3,080,012 kWh $0.05
Electricity Demand $143,405 9,778 kW-months/year $14.67
Natural Gas $12,713 1,810 MMBtu $7.02
TOTAL ENERGY COSTS $310,987
RECOMMENDED SAVINGS* $758,189 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,546
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$177,242
Cost:
$44,000
$113,868 2,277,843 $63,374 4,320 - - - - $113,868
2,277,843
kWh
$63,374
4,320
kW-months/year
-
-
lb
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$5,718
Cost:
$2,500
$3,341 66,823 $2,377 162 - - - - $3,341
66,823
kWh
$2,377
162
kW-months/year
-
-
lb
-
-
$
03: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$1,717
Cost:
$1,000
$1,248 24,912 $469 32 - - - - $1,248
24,912
kWh
$469
32
kW-months/year
-
-
lb
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,228
Cost:
-
$594 12,016 $634 43 - - - - $594
12,016
kWh
$634
43
kW-months/year
-
-
lb
-
-
$
05: 3.7131 USE A RAG RECYCLE SERVICE Savings:
$10,318
Cost:
$1,200
- - - - $10,318 - - - -
-
kWh
-
-
kW-months/year
$10,318
-
lb
-
-
$
06: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$331,304
Cost:
$21,000
- - - - - - $331,304 - -
-
kWh
-
-
kW-months/year
-
-
lb
$331,304
-
$
07: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$108,568
Cost:
$13,000
- - - - - - $108,568 - -
-
kWh
-
-
kW-months/year
-
-
lb
$108,568
-
$
08: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$22,000
Cost:
-
- - - - - - $22,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$22,000
-
$
09: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$89,794
Cost:
$81,000
- - - - - - $89,794 - -
-
kWh
-
-
kW-months/year
-
-
lb
$89,794
-
$
10: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$10,300
Cost:
$8,000
- - - - $10,300 - - - -
-
kWh
-
-
kW-months/year
$10,300
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$758,189
Cost:
$171,700
$119,051 2,381,594 $66,854 4,557 $20,618 - $551,666 - $119,051
2,381,594
kWh
$66,854
4,557
kW-months/year
$20,618
-
lb
$551,666
-
$
TOTAL IMPLEMENTED Savings:
$11,546
Cost:
$1,200
$594 12,016 $634 43 $10,318 - - - $594
12,016
kWh
$634
43
kW-months/year
$10,318
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes