Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1998
Principal Product Couplers
NAICS n/a
SIC 3644 - Noncurrent-carrying Wiring Devices
Sales $10,000,000-$50,000,000
# of Employees 42
Plant Area (Sq.Ft.) 38,100
Annual Production 14,000,000 Pieces
Production Hrs. Annual 2,080
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $52,967 689,039 kWh $0.08
Electricity Demand $29,502 3,199 kW-months/year $9.22
Natural Gas $31,247 5,779 MMBtu $5.41
TOTAL ENERGY COSTS $113,716
RECOMMENDED SAVINGS* $17,261 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$901
Cost:
-
$541 7,034 $360 39 - - $541
7,034
kWh
$360
39
kW-months/year
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,500
Cost:
$36,250
$4,780 62,134 $2,720 295 - - $4,780
62,134
kWh
$2,720
295
kW-months/year
-
-
$
03: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$8,860
Cost:
$3,100
- - - - $8,860 - -
-
kWh
-
-
kW-months/year
$8,860
-
$
TOTAL RECOMMENDED Savings:
$17,261
Cost:
$39,350
$5,321 69,168 $3,080 334 $8,860 - $5,321
69,168
kWh
$3,080
334
kW-months/year
$8,860
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes